Well ID: 34-099-23125 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05281359,"lon":-80.55586058,"icon":""}]} |
County: Mahoning | |
Municipality: | |
Operator Name: BOCOR HOLDINGS, LLC/BOCOR PROD | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-10-15 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.05281359 | |
Longitude: -80.55586058 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 4464.0 | 0.0 | ||||
2013-0 | 2642.0 | 0.0 | ||||
2014-0 | 2598.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1021032095 | 2010-04-29 | I performed a rig inspection. The ID sign was posted. The pits and pit liner were installed. The silt fence was in place on the south side. There were no violations at this time. | ||||
1251035492 | 2010-05-04 | I performed a rig inspection on G & H rig #91. They were logging well. TD was 5825'. The drilling rig and drilling site satisfies rule 1501:9-9-03. There were no violations at this time. | ||||
1287684065 | 2010-10-16 | The surface casing cement operation was witnessed and found satisfactory. | ||||
1287756743 | 2010-10-22 | The production casing was installed and cemented. There was no interruption of circulation observed. Cement operation went as planned. | ||||
1473559801 | 2010-05-03 | I performed a rig inspection on G & H rig#91. The rig was in compliance. The drilling depth was 5457' and drilling on air/soap. There were no violations at this time. | ||||
1738776642 | 2010-10-18 | I performed a rig inspection on G & H drilling rig 91. The rig had tested the BOP before drilling out of the surface. The BOP was tested to 365 psi. and held for 15 minutes. I did not witness the testing of the BOP. The drilling depth was 3877' and drilling on air/soap. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
1879659782 | 2010-11-15 | The drilling pits are closed. The top soil has been spread on the crow field. The tank battery is installed. | ||||
2014365303 | 2010-05-06 | The drilling pit fliud level was down 3 feet from the surface. The drilling rig was gone. This well has not passsed preliminary restoration. | ||||
2030728786 | 2010-12-29 | The fences were around the tank battery and the wellhead. The ID sign was posted. The drilling area was in a farm bean field. The area is ready to farm again. There were no violations at this time. This well PASSES PRELIMINARY RESTORATION. | ||||
2065739624 | 2010-10-19 | I performed a rig inspection on G & H rig 91. The drilling depth was 4726' and drilling on air/soap. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
-2116465854 | 2010-04-29 | I witnessed the testing of the BOP hydrill. The BOP was tested to 358psi. For 15 minutes. 0 psi was lost in that time period. There were no violations at this time. | ||||
323407594 | 2010-08-16 | The fences have been installed around the tank battery and the wellhead. The ID sign was posted. This well PASSES PRELIMINARY RESTORATION. | ||||
35585615 | 2010-10-25 | The drilling rig was gone. The blow pit fluid level was down 5 feet from the top. The fluid pit fluid level was down 4 feet from the top. There were no violations at this time. | ||||
-419497178 | 2012-12-28 | I completed a status check of this well. The lease road is well maintained and gated leading up to a fenced in production tank and a brine tank with proper signage and identification. The production tank contains a flame arrestor and charcoal filters. Also located in the fenced area is a vertical separator and everything is contained within a well maintained SPCC dike. The plunger lift well is located in a pasture and is also fenced in. There are no violations at this time. | ||||
-436213350 | 2010-06-02 | The top soil has been spread over the location. No vegetation growth yet. This well has not passed preliminary restoration. | ||||
-69003418 | 2010-11-01 | I witnessed the fracing of the Clinton zone. Universal preformed the frac. The job summary will be sent to the Columbus office. There were no violations at this time. | ||||
737048025 | 2010-04-27 | The drilling rig G & H rig 91 was on the drilling location. The pits were dug with the liner installed. The rest of the rig is on its way. The ID sign was posted. There were no violations at this time. | ||||
90604704 | 2010-05-24 | The drilling pits have been solidified and closed. The top soil piles are being spread on the drilling location. This well has not passed preliminary restoration. |
For data sources see[2]