If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-21835 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.95224136,"lon":-80.89255202,"icon":""}]} |
County: Mahoning | |
Municipality: | |
Operator Name: ENERVEST OPERATING L | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-10-04 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.95224136 | |
Longitude: -80.89255202 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2005-0 | 0.0 | 0.0 | ||||
2006-0 | 3136.0 | 1241.0 | ||||
2007-0 | 3303.0 | 1195.0 | ||||
2008-0 | 1870.0 | 721.0 | ||||
2009-0 | 1746.0 | 606.0 | ||||
2010-0 | 1264.0 | 665.0 | ||||
2011-0 | 946.0 | 517.0 | ||||
2012-0 | 934.0 | 333.0 | ||||
2013-0 | 923.0 | 331.0 | ||||
2014-0 | 831.0 | 365.0 | 436.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1128518312 | 2005-10-04 | The rig is moving in at this time. Spud will be within the next two hours. Surface will be tomorrow afternoon. | ||||
-1554048376 | 2005-10-05 | Arrived on site for the surface job. Observed the running in of the casing and cementing in. Approximately 6 bbls of cement returns. | ||||
2131863244 | 2006-05-11 | The pits are filled. Partial compliance. The tank battery consists of 1-210 bbl storage tank, 1-50 bbl salt water tank, 1-separator and a dike. |
For data sources see[2]