If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24095 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.05210328,"lon":-81.38698442,"icon":""}]} |
| County: Guernsey | |
| Municipality: | |
| Operator Name: HILL DAVID R INC | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2008-10-16 | |
| Unconventional: No | |
| Configuration: Vertical | |
| Well Status: Producing | |
| Violations: 0 | |
| Latitude: 40.05210328 | |
| Longitude: -81.38698442 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2009-0 | 7555.0 | 44.0 | ||||
| 2010-0 | 11797.0 | 60.0 | ||||
| 2011-0 | 13919.0 | 0.0 | ||||
| 2012-0 | 8747.0 | 0.0 | ||||
| 2013-0 | 8159.0 | 64.0 | ||||
| 2014-0 | 6821.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1225289824 | 2008-10-28 | KILBARGER DRILLING #17. DRILLING AT 3405' | ||||
| 1362232421 | 2013-03-01 | Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established. | ||||
| 1489217052 | 2015-03-19 | On the day of my inspection I witnessed the production equipment included a 140bbl tank, a 30bbl brine tank, a vertical separator, a drip, a 2 inch sales meter with a .75 inch orifice and chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing and a plunger lift system with valves in the open position on the tubing and 1 of 2 open on the casing supplying the motor valve. Identification was present and production records were current. | ||||
| -1552809759 | 2008-10-29 | KILBARGER DRILLING # 17. DRILLING AT 4405'. | ||||
| -1618716103 | 2009-12-02 | Restoration work at site satisfactory pit has been filled in and site restored and vegatation has been established,well is equipped with 8 surface casing and 4.5' production casing and 2.375 tubing and 1-100 bbl tank and 1-50 bbl water tank located in dike area. | ||||
| 1906665270 | 2009-02-11 | WELL FRACED AND SWAB RIG ON HOLE TODAY. STARTING TO SWAB WELL TO DRY UP . RUN TUBING THEN PUT IN PRODUCTION. | ||||
| -375198463 | 2009-01-23 | APPALACHIAN WELL SURVEY'S. PERFORATED PIPE TODAY. | ||||
| 391552711 | 2008-10-27 | KILBARGER DRILLING #17 BACK TO DRILLING AT 1518' | ||||
| 704777270 | 2008-10-21 | BADERSCHER CUTTING LOCATION. |
For data sources see[2]