If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.28051972,"lon":-81.25475265,"icon":""}]} |
County: Portage | |
Municipality: | |
Operator Name: TRANSCONTINENTAL O & G | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-02-02 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.28051972 | |
Longitude: -81.25475265 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2007-0 | 221.0 | 207.0 | ||||
2008-0 | 1986.0 | 597.0 | ||||
2009-0 | 2616.0 | 472.0 | ||||
2010-0 | 2155.0 | 329.0 | ||||
2011-0 | 2540.0 | 554.0 | ||||
2012-0 | 1929.0 | 294.0 | ||||
2013-0 | 2963.0 | 301.0 | ||||
2014-0 | 3128.0 | 365.0 | 281.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-2115114692 | 2007-08-15 | Preliminary restoration is approved. | ||||
-2132399326 | 2007-02-13 | Capstar Drilling is moving off the location. The shale pit was full and I asked Bill Marks to pump water from the shale pit to the blow pit. | ||||
576246157 | 2007-02-27 | The drilling pits have been pump down and now have sufficient freeboard to contain any precipitation or runoff. No violations at this time. | ||||
646874314 | 2007-02-07 | Capstar is drilling ahead and should finish by February 9. The pits are lined and in good condition. Overspray from the blow line is getting beyond the blow pit. A small dike directs the spray back into the pit. | ||||
718275717 | 2007-06-20 | The site has been graded. Still needs to be seeded and mulched before approving preliminary restoration. |
For data sources see[2]