Well ID: 34-019-22451 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.60820891,"lon":-81.06175963,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: R E GAS DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-01-24 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.60820891 | |
Longitude: -81.06175963 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 66074.0 | 28.0 | 12693.0 | 28.0 | ||
2014-4 | 214967.0 | 92.0 | 25188.0 | 92.0 | ||
2015-1 | 157960.0 | 90.0 | 16250.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1422634925 | 2015-01-15 | I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 9, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of: | ||||
-2042990477 | 2014-04-01 | I was on location to observe the cementing operations of the 13.375 surface casing on Sidewinder Rig # 63. Universal cemented 983' of 54.5 lbs./ft casing. Cement load consisted of 791 sacks of Type - 1 , 2 % Calium Chloride, 0.2 % Foam Check, 1/4 lbs. / sack celloflake. Cement was circulated back to surface receiving 40 Bbls. of cement back to surface.Water temp. was 44, pH -7. No violations. | ||||
-287433862 | 2014-04-07 | I was on location to check the drilling status of the Jenkins # 4-H on 4/7/2014. Sidewinder Rig 63 was pulling the drill string out of the hole in order to allow Express Energy Services run a cement bond on the 9.625 casing. The total depth of the well was 6950'. No violations. | ||||
923604536 | 2014-04-03 | I was on the Jenkins # 4-H to observe the cementing operations. Sidewinder Rig #63 ran 9.625 casing to 2000'. Universal Well Services mixed and circulated 612 sacks of Gas Block, .15% CR3 cement. Water temp was 45 , pH was -7, Cement was weighed twice first it was 15.3 lbs./gal, then it weighed 15.8 lbs./gal. Cement was returned to surface in the amount of 20 Bbl. Of cement. No violations. |
For data sources see[2]