If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23120 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01936449,"lon":-81.56182845,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-11-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.01936449 | |
Longitude: -81.56182845 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1011123396 | 2010-11-23 | Union Drilling Rig 24 is drilling ahead on salt water. No violations at this time. | ||||
-1124359250 | 2010-11-17 | Union Drilling Rig 24 is nearly rigged up over the well. They should be ready to spud sometime tomorrow. | ||||
1292250354 | 2010-11-26 | Union Drilling Rig 24 is drilling ahead with saltwater. No violations at this time. | ||||
-1325914645 | 2010-12-29 | Completed the mechanical integrity test on the 7 casing cemented in this well on 11/30. The test began at 09:00 am with an initial pressure of 565 psi. After 15 minutes, the pressure remained at 565 psi. The MIT passed. Cargill will notify MRM when the cement bond logs are scheduled for the Akron 76 and 77 wells. | ||||
-133943894 | 2011-10-24 | Preliminary Restoration is approved. | ||||
-1741134592 | 2014-12-05 | An inspection of the well found no violations at the time. | ||||
1915525590 | 2013-06-24 | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||||
418861707 | 2010-11-28 | Union Rig 24 is drilling ahead with saltwater. Should TD the well in the next 24 hours. No violations at this time. |
For data sources see[1]