If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24367 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84826414,"lon":-81.39813218,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-09-04 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.84826414 | |
Longitude: -81.39813218 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 0.0 | 0.0 | ||||
2013-3 | 0.0 | 0.0 | ||||
2013-6 | 0.0 | 0.0 | ||||
2013-9 | 0.0 | 0.0 | ||||
2014-3 | 99156.0 | 41.0 | 5962.0 | 41.0 | ||
2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-2 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-4 | 95921.0 | 58.0 | 3869.0 | 58.0 | ||
2015-1 | 197494.0 | 63.0 | 9466.0 | 63.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1059246347 | 2012-08-30 | On site to witness Formation Integrity Test they pressured up on formation to 915 psi and we had no decline in pressure. | ||||
-111264721 | 2012-08-01 | Called out to rig for 20 casing job when I arrived they were running casing to a depth of 253' but the permit called for 500' so decision was made to pull casing and drill to proper depth and run casing at a later date and cement casing in place at that time. | ||||
1113735384 | 2013-12-05 | The preliminary restoration requirements have been met. The tank battery consists of six 400 bbl tanks set inside of above ground containment. | ||||
1806985911 | 2012-07-05 | Drill pad nearly complete they should have conductor rig on site later this week. | ||||
-276335111 | 2013-12-05 | The preliminary restoration requirements have been met. The tank battery consists of six 400 bbl tanks set inside of above ground containment. |
For data sources see[2]