If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-22587 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.58274189,"lon":-82.32628612,"icon":""}]} |
County: Hocking | |
Municipality: | |
Operator Name: LOGAN GAS INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1981-12-07 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.58274189 | |
Longitude: -82.32628612 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
1985-0 | 3000.0 | 837.0 | ||||
1986-0 | 3550.0 | 683.0 | ||||
1987-0 | 3400.0 | 690.0 | ||||
1988-0 | 2321.0 | 452.0 | ||||
1989-0 | 2181.0 | 392.0 | ||||
1990-0 | 2494.0 | 380.0 | ||||
1991-0 | 1020.0 | 209.0 | ||||
1993-0 | 2450.0 | 408.0 | ||||
1994-0 | 2095.0 | 467.0 | ||||
1995-0 | 2275.0 | 399.0 | ||||
1996-0 | 2669.0 | 464.0 | ||||
1997-0 | 2086.0 | 304.0 | ||||
1998-0 | 1943.0 | 347.0 | ||||
1999-0 | 500.0 | 218.0 | ||||
2000-0 | 445.0 | 223.0 | ||||
2001-0 | 360.0 | 128.0 | ||||
2002-0 | 189.0 | 0.0 | ||||
2003-0 | 161.0 | 0.0 | ||||
2004-0 | 137.0 | 0.0 | ||||
2005-0 | 164.0 | 153.0 | ||||
2006-0 | 17.0 | 485.0 | ||||
2007-0 | 0.0 | 246.0 | ||||
2008-0 | 0.0 | 267.0 | ||||
2009-0 | 0.0 | 74.0 | ||||
2010-0 | 0.0 | 178.0 | ||||
2011-0 | 0.0 | 117.0 | ||||
2012-0 | 0.0 | 376.0 | ||||
2013-0 | 263.0 | |||||
2014-0 | 0.0 | 300.0 | 141.0 | 300.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Compliance Notice | |||
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Field Visit or Inspection | |||
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Field Visit or Inspection | |||
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Compliance Notice | |||
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Compliance Notice | |||
1009865562 | 2011-02-02 | FOLLOW UP TO NOV # 199065538 FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | Compliance Notice | |||
-1022196298 | 2004-01-30 | An inspection of the well revealed the wrong Permit # at the well. | ||||
1206622232 | 2008-03-05 | No violations were noted. | ||||
1266867243 | 2010-02-01 | An inspection revealed that gas is being vented from the well without the use of a flare. Inside the earthen dike at tank battery, pollution and contamination was observed at two locations. The first observed location was a fitting leak from a separator. The second location was underneath a knockout (standing) containing corrosion and found leaking at time of inspection. High Range Quantabs placed in fluid showed 10 units. A 1 line black plastic line was observed connected to bottom of knockout and no connection on opposite end of line. At conclusion of inspection, the well owner, Oil Enterprises, was notified in person of inspection results. The well owner states violations will be taken care of tomorrow. | ||||
1267214964 | 2010-02-02 | A follow-up inspection revealed non-compliance. | ||||
1267469988 | 2010-02-04 | A follow-up inspection revealed non-compliance. The knock-out tank is no longer leaking. P&C and venting gas still exists. | ||||
1296671350 | 2011-02-02 | Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | ||||
-1326632992 | 2010-03-01 | A follow-up inspection revealed compliance. No gas was being vented at time of inspection. It was also noted that well ownership has now changed to Logan Gas Inc. Note: snow cover at time of inspection. | ||||
-154737019 | 2011-02-02 | FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | ||||
1572614357 | 2013-11-26 | Compliance notice follow up. The well has a legible identification, this satisfies the compliance notice. | ||||
-1948556564 | 2004-03-03 | AD test on well, well passed test. | ||||
199065538 | 2011-02-02 | FOLLOW UP TO NOV # 1296671350 Inspected by Andy Thomas. Identification tag faded on well head. Will need rewritten. Fitting on bottom of separator need repaired or replaced. Small leak starting to appear. Corrosion on bottom of knockout tank, and liquid underneath of it indicated that it may be leaking. Results of the high range quantab test revealed that the liquid under it was over 2000 ppm. Appears a fitting had been replaced or repaired on the bottom of production tank which allowed a small amount of oil to contaminate dike area. ID tag needs replaced, all producing leases shall be legibly identified in a conspicuous place on or near the well-head or the storage tank(s) as to owner, lease name, well number, permit number where available, county, and an emergency telephone number. Fitting on bottom of separator needs repaired/replaced. All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. Knockoff tank needs repaired or replaced. All wells must be equipped so that no oil, gas or condensate is allowed to escape with the exception of gas flares. Clean up all oily material and dispose of in proper manner. At 3:20 PM spoke with Ray St. Clair via telephone and explained violations and what was needed to correct problem. He was already aware of the issues that the tank battery was having and had already bypassed knockout tank. | ||||
203131527 | 2010-10-07 | An inspection revealed locations inside the earthen dike have been remediated. Also noted, the (2) 100 bbl tanks now contain fresh paint. No violations were noted. | ||||
-2057990010 | 2005-03-28 | No violations. | ||||
-2872736 | 2009-05-20 | An inspection was conducted to verify the status of Annular Disposal connection. It was noted that AD has been disconnected and is not being utilized. (2) 100 bbl tanks are a source for brine storage. At the time of the inspection, the knockout tank was found not connected. | ||||
44270325 | 2014-02-26 | Compliance notice follow-up. The well has a legible identification, this satisfies the compliance notice. | ||||
818425852 | 2010-02-08 | A follow-up inspection revealed new black plastic line from separator to 100 bbl tank. Gas is still being vented without use of flare. Note: snow cover at time of inspection. | ||||
-96079345 | 2004-02-25 | Follow-up on NOV, In-Compliance. |
For data sources see[2]