Well ID: 34-035-22081 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.54174587,"lon":-81.45534681,"icon":""}]} |
County: Cuyahoga | |
Municipality: | |
Operator Name: BASS ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-01-01 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.54174587 | |
Longitude: -81.45534681 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 35893.0 | 0.0 | ||||
2011-0 | 54150.0 | 57.0 | ||||
2012-0 | 49418.0 | 0.0 | ||||
2013-0 | 33957.0 | 0.0 | ||||
2014-0 | 21476.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1178431893 | 2009-11-30 | No violation | ||||
-1303697503 | 2009-04-30 | working on tank battery dike, which will have poured cement walls. | ||||
1325250872 | 2011-12-28 | On 12/28/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. | ||||
1424788380 | 2015-02-24 | I inspected this well as part of routine inspection activity . Connections and fittings at the wellhead and battery are secure. Enclosure gates are locked. Signage is present and accurate. Load-outs are plugged and secure. Production reports are current. At the time of this inspection there is 12 to 15 inches of snow cover, which obscures some of the surficial features. The areas surrounding the wellhead and battery are comprised of asphalt paving which are partially covered with snow. I did not observe any signs of impacts relating to the well on the surrounding areas. | ||||
1532109636 | 2013-09-25 | The producing unit is comprised of a wellhead with mechanical plunger lift system and an above-ground storage tank (AST) battery. The wellhead and battery are in separate, board-on-board enclsoures. The well is producing and no problems or violations noted. Preliminary restoration passes. | ||||
-162925338 | 2009-03-10 | Meeting with Jim Austin Building dept city Mayfield hts to check area for revised Tank Battery
The tank battery will be 50' to northwest of well casing just in parking area. |
||||
-1676801841 | 2009-01-07 | drilling 3490' no violation | ||||
1840045003 | 2009-01-08 | drilling at 3517' | ||||
1956752175 | 2014-02-04 | I observed the producing unit to be in good condition and no violations noted. No changes since the previous inspection. | ||||
-1957950963 | 2009-10-16 | checked site fencing up tank battery and well no violation. | ||||
1962959571 | 2013-01-14 | The unit is comprised of the following elements: a tank battery with 2 140-barrel tanks, a mechanical separator, with plunger lift at wellhead. The tank battery and wellhead are each in separate enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked. | ||||
-909142575 | 2009-05-01 | working on tank battery, putting in concrete walls and board on board fencing for dike. |