If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21820 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.65499762,"lon":-80.89176349,"icon":""}]} |
County: Columbiana | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-08-04 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.65499762 | |
Longitude: -80.89176349 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 8268.0 | 2.0 | 0.0 | 2.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1080228775 | 2013-05-29 | I went to the site and conducted a pre-construction site inspection with Cody Theimer and Matt Garrison, Chesapeake Field Representative, Blake Arthur and Brad Sellers of ODNR DOGRM, and landowner Sam Johnson. | ||||
-10959313 | 2013-08-06 | I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole. A second rig was on site drilling the conductor hole for the Summitcrest 35-14-4 3H. In addition, a crew was on site installing a pad drainage system. | ||||
1107214617 | 2013-09-03 | I was at the site to witness the cementing of the surface casing. The drilling contractor, Nomac 74, spudded the surface section of the well on 09/02/2013. The 17.50 diameter surface hole was drilled to 840 | ||||
1379344466 | 2013-09-14 | I was at the site to witness the cementing of the production casing. The drilling contractor, Nomac 74, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1697 | ||||
1725820048 | 2013-08-08 | I witnessed the cementing of the conductor casing. Precision Rathole drilled a 26 diameter hole to 40 | ||||
-40732826 | 2014-12-10 | I was onsite to conduct a preliminary restoration inspection. There are two wells on the pad. Access road entry is on the south side of Lewis Road approximately 0.17 miles east of Emerick Road. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a cattle gate that is open midway up the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a | ||||
75786086 | 2013-09-05 | I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 74, drilled a 12.25 diameter hole to 1710 |
For data sources see[2]