If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23740 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.12502727,"lon":-81.91297805,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-12-15 | |
Unconventional: | |
Configuration: | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 39.12502727 | |
Longitude: -81.91297805 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1419352990 | 2014-12-23 | Witnessed intermediate casing pressure test and Annular Disposal casing test. 450 psi was placed on the 7 intermediate casing, which was encased with cement from 763 feet to surface, and after 1/2 hour the pressure had dropped by 10 psi. casing pressure and annular disposal test requirements met. | ||||
1420036823 | 2014-12-31 | Witnessed 1935 feet of new 10.5 lb/ft 4 1/2 casing set in 1960 feet of 6 1/4 borehole with 36 sacks of Class A cement. Centralizers placed on the first, third, seventh, 17th, and 19th joints. | ||||
-287434091 | 2015-05-14 | Checking pit closure for two month restoration requirements. Pits closed but area has not been graded or reseeded yet. | ||||
-348358276 | 2014-12-30 | Currently drilling around 1430 feet. The Big Injun Sandstone was encountered around 1400 feet and the mud pump is now running. | ||||
47109772 | 2014-12-08 | Presite review with producer. |
For data sources see[1]