If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.65212037,"lon":-81.96886832,"icon":""}]} |
County: Morgan | |
Municipality: | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-12-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.65212037 | |
Longitude: -81.96886832 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 1089.0 | 0.0 | ||||
2013-0 | 1039.0 | 70.0 | ||||
2014-0 | 288.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1326804047 | 2012-01-17 | Talked to Heath (ARTEX) who informed me that they finished drilling this well on 1/15/12 and cemented casing. I was not notified of these activities. Total depth of this well was 6456'. | ||||
1340619799 | 2012-06-21 | My inspection due to call from Frank, reclamination supervisor of Artex | ||||
1347463731 | 2012-09-12 | Preliminary Restoration passed on 9-12-12 by Patrick Shreve. Company man Frank Riggle was present on day of inspection. | ||||
-698715745 | 2014-06-04 | There is heavy equipment on location. The pit has been filled and the operator has recently graded the location. The well is currently in production and there is a current chart on the meter. There is one 100 and one 210 bbl tank in the dike. Operator needs to build up the dike. Site does not yet meet preliminary restoration requirements. |
For data sources see[2]