X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23143

Well Details

Well ID: 34-153-23143
Loading map...
County: Summit
Municipality:
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-11-17
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.02683602
Longitude: -81.48087681

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 22687.0 696.0
2013-0 13548.0 450.0
2014-0 12270.0 365.0 369.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1092869450 2011-12-21 The pits have been solidified and backfilled. Everflow will cover this area with asphalt after it has stabilized. The well has been fraced and 1.5 tubing installed.
-1129580220 2011-11-21 Poulson is drilling on fluid at 3900' and should reach total depth tomorrow morning. They switched from air to fluid drilling at 3550' as required by permit. The pits are fenced, lined and in good condition.
-1206000141 2011-11-16 Poulson Drilling is starting to move on location. They should be ready to spud the well later tonight or tomorrow.
-1268797619 2011-12-01 The drilling pits have been solidified and are being covered over. The well is scheduled to be perforated and fraced next week.
1321308308 2011-11-04 The location is ready for the drilling rig. The asphalt parking lot will not be cut or disturbed until the rig arrives.
1474388939 2012-07-10 Preliminary Restoration is approved.
-613994909 2011-11-28 Poulson Drilling has moved off location. The pits have been pumped down and are fenced, lined and in good condition.
739779534 2012-01-18 The flowline is being installed from the wellhead to the existing tank battery for the AFA #4 well. The safety bollards are in place and pits have been solidified and covered. The affected area will be repaved as soon as the weather permits.
932822456 2011-11-17 Poulson spudded this well early this morning and set but did not cement 62' of 11.75 conductor casing. They are currently drilling an 11 surface hole and should be ready to cement casing late tonight. The drilling pits are fenced, lined and in good condition.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.