If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23143 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02683602,"lon":-81.48087681,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-11-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.02683602 | |
Longitude: -81.48087681 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 22687.0 | 696.0 | ||||
2013-0 | 13548.0 | 450.0 | ||||
2014-0 | 12270.0 | 365.0 | 369.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1092869450 | 2011-12-21 | The pits have been solidified and backfilled. Everflow will cover this area with asphalt after it has stabilized. The well has been fraced and 1.5 tubing installed. | ||||
-1129580220 | 2011-11-21 | Poulson is drilling on fluid at 3900' and should reach total depth tomorrow morning. They switched from air to fluid drilling at 3550' as required by permit. The pits are fenced, lined and in good condition. | ||||
-1206000141 | 2011-11-16 | Poulson Drilling is starting to move on location. They should be ready to spud the well later tonight or tomorrow. | ||||
-1268797619 | 2011-12-01 | The drilling pits have been solidified and are being covered over. The well is scheduled to be perforated and fraced next week. | ||||
1321308308 | 2011-11-04 | The location is ready for the drilling rig. The asphalt parking lot will not be cut or disturbed until the rig arrives. | ||||
1474388939 | 2012-07-10 | Preliminary Restoration is approved. | ||||
-613994909 | 2011-11-28 | Poulson Drilling has moved off location. The pits have been pumped down and are fenced, lined and in good condition. | ||||
739779534 | 2012-01-18 | The flowline is being installed from the wellhead to the existing tank battery for the AFA #4 well. The safety bollards are in place and pits have been solidified and covered. The affected area will be repaved as soon as the weather permits. | ||||
932822456 | 2011-11-17 | Poulson spudded this well early this morning and set but did not cement 62' of 11.75 conductor casing. They are currently drilling an 11 surface hole and should be ready to cement casing late tonight. The drilling pits are fenced, lined and in good condition. |
For data sources see[2]