If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22264 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44083332,"lon":-81.02264712,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-03-09 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.44083332 | |
Longitude: -81.02264712 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 268209.0 | 4553.0 | ||||
2014-1 | 332394.0 | 78.0 | 5412.0 | 78.0 | ||
2014-2 | 374406.0 | 90.0 | 5501.0 | 90.0 | ||
2014-3 | 467293.0 | 91.0 | 2827.0 | 91.0 | ||
2014-4 | 345327.0 | 89.0 | 1497.0 | 89.0 | ||
2015-1 | 317608.0 | 90.0 | 829.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1358365040 | 2013-01-16 | I was on site to check on the status of Precision Drilling. My inspection revealed that they have drilled the conductor hole to a total depth of 120' and ran 120' of 20 casing into the wellbore on the #10 well. They advised me that they have other conductor holes on this pad and they will drill those holes and run casing before contacting the cementers. They have two rigs drilling at this time on the # 6 and #8 wells. They also advised that Chesapeake has decided not to drill the # 3 and # 5 wells at this time. They should be finished drilling and running casing by the end of this week and could possibly be ready to cement the conductor casings sometime this weekend. |
For data sources see[2]