Well ID: 34-067-21405 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.22889776,"lon":-81.14925451,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: | |
Configuration: | |
Well Status: | |
Violations: 0 | |
Latitude: 40.22889776 | |
Longitude: -81.14925451 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1344616711 | 2015-05-11 | On the date of inspection I am on site to check the status of the Sproull 3H conductor that has yet to be cemented. The Sproull 9H was topped off with ready mix over the weekend and the cellar is sealed. | ||||
-378517718 | 2015-05-05 | I am on site today to witness the running and the cementing of the 30 inch diameter casing string. Precision Rat Hole drilled a 36 inch diameter hole to 100 ft. and set 100 ft. of 118 lb. casing. Allied Cementing Service cemented with 560 sacks of class A cement at 15.6 lb. and a yield of 1.20 During the drilling of the 36 inch hole the well collapsed at 30 ft. to 38 ft. and they used 21 yards of grout to fill the collapsed section. They waited until after it had set up then drilled it out to 100 ft. The well bore will not be uniform top to bottom and that is why they are running so much extra cement. |