If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24339 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97828651,"lon":-81.42014229,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: PDC ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-23 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.97828651 | |
Longitude: -81.42014229 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 145976.0 | 90.0 | 36558.0 | 90.0 | ||
2014-4 | 17007.0 | 13.0 | 4401.0 | 13.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1240602840 | 2014-03-26 | On the day of my inspection I witnessed that Express Energy Services had reamed a 36 inch diameter hole to 42 inches to the depth of 115 feet and set 115 feet of 30 inch conductor pipe. Express Energy Services cemented the pipe with 520 sacks of Class A cement with 2% CaCl. Had good returns of 11bbls and cement stayed to surface. | ||||
-1784092013 | 2014-07-29 | On the day of my inspection accompanied by ODNR Southeast Regional Supervisor Rocky King, I met with Company Man Larry Howell. H & P Flex Rig #385 had drilled a 12.25 inch diameter hole to a depth of 3417 feet and was tripping out of the hole to get directional tools with an estimated td of 6400 feet for the 2nd intermediate section. | ||||
1970549532 | 2014-08-19 | On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A. | ||||
798955692 | 2014-03-25 | On the day of my inspection I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 115 feet and set 115 feet of 30 inch conductor pipe. Express Energy Services cemented the pipe with 320 sacks of Class A cement with 2% CaCl. Had good returns and cement stayed to surface. |
For data sources see[2]