If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24518 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49778499,"lon":-82.42053165,"icon":""}]} |
County: Knox | |
Municipality: | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-06-18 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.49778499 | |
Longitude: -82.42053165 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 7612.0 | 3513.0 | ||||
2012-0 | 23067.0 | 7981.0 | ||||
2013-0 | 15059.0 | 7639.0 | ||||
2014-0 | 12474.0 | 365.0 | 7129.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1308579962 | 2011-06-19 | I inspected the well location shortly after the surface cement job had taken place. There was evidence around the surface casing that there had been good cement returns to the surface. The drilling rig hands installed a blow line and completed a BOP test. The test pressure was 360psi and held for 20 minutes with no loss. After the test, drilling commenced. There was approximately 40 feet of cement left in the hole. The pits are properly lined and retaining fluids. There are no violations noted this date. | ||||
1541417331 | 2011-06-20 | G&H Drilling rig on location and drilling this new well. They are currently drilling on air and at a depth of 1600 feet. No violations noted this date. | ||||
696233672 | 2013-04-10 | This well is a producing well. |
For data sources see[2]