34-053-20957

Well Details

Well ID: 34-053-20957
Loading map...
County: Gallia
Municipality:
Operator Name: OHIO VALLEY ELECTRIC CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1991-07-21
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 38.91854064
Longitude: -82.14408273

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2000-0 696.0 58.0
2001-0 142.0 69.0
2002-0 114.0 73.0
2003-0 55.0 45.0
2004-0 18.0 22.0
2005-0 22.0 108.0
2006-0 29.0 66.0
2007-0 2.0 23.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1011274212 2007-11-21 One of the next wells to be plugged. Took GPS on well and checked status of well. Rods and tubing have been pulled. Pump jack has been removed. Compliance Notice
-1011274212 2007-11-21 One of the next wells to be plugged. Took GPS on well and checked status of well. Rods and tubing have been pulled. Pump jack has been removed. Informal Letter
1173726727 2007-03-08 Well is leaking oil. The oil is contained in a little dike. Id ok.
-1236538006 2003-01-22 Preliminary restoration meets the requirements of 1509.072 ORC.
1525985789 2007-12-12 Pulled 1663' of 1 tubing, Pulled 2.875 Refused to talley pipe. The 2.875 was set on a packer. This suggests a hole in the 4.5. Well records show that the 4.5 was cemented and the cement should be up the backside of casing to 1276'. Set bottom plug mixed hot to set fast. Pulled tubing. Wire line shot at 1096' pulled 1 joint and set 200' plug. Continued plugging to the surface.
-1627485488 2007-04-19 Dike at wellhead is clean of oil . The oil and soil has been moved to a plastic lined small pit next to the well. The power lines are still low. AEP is in the process of buying this well and plugging it.
-1743115470 2006-05-22 New motor for operating jack; well in production.
389302119 2008-04-03 Ohio Valley Electric Corp. is constructing a landfill for FGD generated from the Kyger Creek Power Plant. The well site is located within the landfill project area and excavation to the location is underway. OVEC has submitted a landowner waiver for the restoration due to their construction of the landfill.
419937342 2004-08-04 Very serious oil leak in dike at well head and outside of dike (see pictures 368 andf 369).

For data sources see[2]