If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21442 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.26504212,"lon":-81.13574793,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2015-03-28 | |
Unconventional: | |
Configuration: | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 40.26504212 | |
Longitude: -81.13574793 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1178436187 | 2015-04-01 | Inspector Akins witnessed the cement jobs for the conductor on this pad. I am checking the fluid level and the cement level and found that the Tin Horns are sealed and ready for the next rig to begin drilling. It is hard to get in to this site because they are repairing the bridge and paving the road at the same time. Traffic is backed up for very long blocks of time. | ||||
1434212517 | 2015-07-13 | I arrived just as job was complete because of last minute notice. Nomac Drilling Rig # 84 drilled a 12-1/4 inch diameter hole to 7400 ft. and set 7397 ft. of 9-5/8 inch diameter casing. O-Tex cemented with 1015 sacks of lead cement at 13.5 lb. and a yield of 1.51 and a tail cement of 1120 sacks at 15.3 lb. and a yield of 1.27 and did not have cement to surface but did have circulation thru the entire job. |
For data sources see[1]