If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24423 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88254006,"lon":-81.42278756,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-09-23 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.88254006 | |
Longitude: -81.42278756 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 428644.0 | 72.0 | 26994.0 | 72.0 | ||
2014-4 | 395844.0 | 92.0 | 25638.0 | 92.0 | ||
2015-1 | 301108.0 | 90.0 | 2328.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1012498975 | 2013-09-30 | My inspection today finds the rig is drilling 17.5 hole at 1503'. | ||||
-1157932356 | 2014-11-05 | My inspection today finds the well is equipped with tubing and is produced by open flow through a choke. The tank battery is comprised of eight 400 barrel tanks located in a steel framed and plastic lined containment. The well site meets preliminary restoration requirements. | ||||
1380040473 | 2013-09-24 | My inspection today finds Express Drilling drilled a 32 inch hole to a depth of 111'. 26 casing was ran to 109'. Allied cemented the casing in place with 336 sks of class A cement. I witnessed 10 bbl of cement returns to surface. Twenty bbl of cement is still in the casing due to the job being stopped because of rising pressures. | ||||
-1473677442 | 2013-09-27 | My inspection today finds the rig crew ran 335' of casing. Allied cemented the casing in place with class A cement. I witnessed 80 bbl cement returns to surface. | ||||
-1712140707 | 2013-10-03 | My inspection today finds the 13.625 casing is parted at 286'. The drilling superintendent is attempting to locate a casing patch. Once the patch is in place they will grout the backside of the casing. | ||||
-192634511 | 2014-01-27 | My inspection today finds the rig is drilling 8.5 hole at a depth of 17287'. |
For data sources see[2]