If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24428 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12460333,"lon":-81.25280525,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-12-19 | |
| Unconventional: | |
| Configuration: | |
| Well Status: Drilling | |
| Violations: 0 | |
| Latitude: 40.12460333 | |
| Longitude: -81.25280525 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1295306613 | 2015-05-06 | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. | ||||
| -2016671421 | 2015-03-27 | On the day of my inspection I witnessed that Nomac Drilling Rig #137 was rigged with no plans to commence drilling until May with the conductor being the only string set to this point. | ||||
| 514952302 | 2015-02-20 | On the day of my inspection I witnessed that Nomac Drilling Rig #137 was rigged up over the 2H. I met with Consultant Buzz Glover and discussed when the rig would commence drilling. At the time of inspection once Nomac Drilling Rig #82 completes the Gary Green S WSH MN Pad personnel will be transferring to #137 and drilling will begin approximately 3 weeks. |
For data sources see[1]