Well ID: 34-167-29618 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.392185,"lon":-81.23614409,"icon":""}]} |
County: Washington | |
Municipality: | |
Operator Name: GREEN HUNTER WATER LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-01-02 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 39.392185 | |
Longitude: -81.23614409 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2007-0 | 8200.0 | 0.0 | ||||
2008-0 | 5538.0 | 0.0 | ||||
2009-0 | 3159.0 | 0.0 | ||||
2010-0 | 2574.0 | 0.0 | ||||
2011-0 | 4939.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1014264494 | 2014-08-14 | Well is still down for repair it appears that packer or tubing has lost integrity. | ||||
-1024802833 | 2014-03-20 | Inspection revealed that injection pump was in operation today.
Note: Called company rep to discuss making final plan to make permanent upgrades to facility. |
||||
-103274041 | 2014-05-05 | Inspection revealed that well is still down waiting on plan to correct equalization issues.
Note: Company has contacted Central Office and they are working on proposal to repair well. |
||||
-1120138162 | 2014-01-28 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that one Oil Hauler's tanker was unloading at site during my inspection. | ||||
1185456986 | 2007-07-25 | Inspection this day found well producing with rabbit, tank freshly painted, will have ID's up soon, good dike, current chart in meter. Location has been reclaimed, landowner farming ground. | ||||
1343814043 | 2013-12-13 | Inspection revealed that injection pump was in operation today and it was noted that annulus pressure has fallen off and I told operator to arrange to have positive pressure applied to annulus ASAP. | ||||
1352945780 | 2013-09-13 | On site to pressure test recently installed flow line they pressured up to 1750 psi and we monitored pressure and visually inspected line to check for possible leakage none were noted at this time. | ||||
1355530400 | 2012-12-14 | On site to witness Packer and tubing run into well to prepare well for conversion to UIC facility, Key Energy ran packer and 4033' of tubing today will finish running tubing and test integrity on 12/17/2012.
Note: Two Central Office personnel on site to witness job also. |
||||
1356100662 | 2012-12-17 | On site to witness setting of packer and witness pressure testing of annulus.
Note: Packer set at 7238.1 and new 2.375 Baker A-3 set lock set under 10K compression perforations@7324'-7332' (32) shots Pumped 500 gal of 15% acid and Baker pumped at a rate of 1.2 bpm at 1540 psi will further test tomorrow with salt brine. |
||||
137114550 | 2013-11-20 | Inspection revealed that injection pump was in operation today and I reminded operator to submit plans for permanent facility construction plan. | ||||
1379022400 | 2013-09-12 | Inspection revealed that owner is in process of constructing temporary injection site facility they have 2-500 bbl tanks within dike area and are currently placing injection pump at site and also they have constructed a small building to be used as a electrical building, they plan on having facility up and running by next week.
Note: Informed owner that a barrel counter will need to be in place before well goes into operation. |
||||
149172631 | 2012-12-27 | No activity at site today due to weather conditions. | ||||
1547888243 | 2014-01-06 | Inspection revealed that injection pump was in operation today and it was noted that operator called and stated that they had a tanker truck off of the lease road and that have called for two additional vacuum trucks to offload stuck truck too ensure that no brine water could possibly enter back waters of the waterway. | ||||
-1592099323 | 2009-04-30 | Inspection this day found well producing with rabbit, tank has good ID's, good dike, current chart in meter. | ||||
1602814986 | 2013-10-01 | On site to witness company owned service rig pull tension on tubing to enable them to tighten up tubing head they were able to fix tubing head and once they repacked head they applied positive pressure to annulus and we monitored pressure for 15 minutes with no decline in pressure. | ||||
1907313891 | 2014-02-12 | Inspection revealed that injection pump was in operation during my inspection and it was noted that one Oil Haulers tanker was unloading at site during my inspection. | ||||
-1946385466 | 2012-12-11 | Key Energy moving service rig on site to prepare well for injection test they will remove current tubing and sand pump well if needed and then place packer and new tubing in well before performing test on said well. | ||||
2109637821 | 2015-04-10 | On site to perform site review for possible plug back operation in the near future once permit is issued. | ||||
297421703 | 2014-04-10 | Inspection revealed that well was shut in on the day of my inspection and I called owner too get update on why the well is shut in at this time and he stated that they were doing a flow back test in preparation for tubing replacement. | ||||
343282651 | 2013-12-02 | Inspection revealed that injection pump was not in operation today due to maximum pressure. | ||||
-344814732 | 2012-12-12 | Service rig on site preparing to pull tubing from well and then run bare tools in well to confirm total depth and then run new tubing and packer into well to do injection test in the Medina Sand. | ||||
-371556428 | 2014-07-30 | Inspection revealed that well has equalized and owner is waiting on service rig to pull packer and tubing from well and possibly recomplete well in a more productive injection zone. | ||||
-413279439 | 2013-10-03 | On site to witness 1000 gal acid job preformed on said well Producers Services pumped 500 gall into formation and we let it soak for 15 min and then they pumped additional 500 gal and let it soak for 30 min and then they performed pressure testing on formation. | ||||
-445858971 | 2012-12-13 | Stopped by service rig for update they were pulling 2.375 tubing today and if all goes well start packer and tubing in well tomorrow. | ||||
-536852463 | 2014-06-16 | Inspection revealed that well is down waiting on company to submit work over plan to repair/replace packer or tubing string. | ||||
76277932 | 2010-12-28 | Inspection this day found well producing with rabbit - this well had big show in Cow Run when drilled, never went back to produce it yet. Tank has good ID's, current chart in meter. | ||||
84301181 | 2013-11-06 | Inspection revealed that injection pump was in operation and I told operator to ask for extension on temporary injection facility and submit plan for facility construction. | ||||
-950254579 | 2015-06-08 | Well is not in operation at this time owner is waiting on plug back permit to be issued. |