Well ID: 34-153-22944 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04268189,"lon":-81.61446317,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: SCHREINER OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-05-18 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.04268189 | |
Longitude: -81.61446317 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2005-0 | 462.0 | 0.0 | ||||
2006-0 | 6425.0 | 79.0 | ||||
2007-0 | 5624.0 | 42.0 | ||||
2008-0 | 4448.0 | 0.0 | ||||
2009-0 | 3728.0 | 71.0 | ||||
2010-0 | 2866.0 | 0.0 | ||||
2011-0 | 1849.0 | 0.0 | ||||
2012-0 | 2438.0 | 0.0 | ||||
2013-0 | 1906.0 | 59.0 | ||||
2014-0 | 839.0 | 365.0 | 59.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-10814242 | 2005-05-31 | The water in the drilling pits has been pumped down and the pits are scheduled to be solidified on 6/01. I told Mike Schreiner that the fence around the pits must stay up until the pits are closed. | Phone Call | |||
-10814242 | 2005-05-31 | The water in the drilling pits has been pumped down and the pits are scheduled to be solidified on 6/01. I told Mike Schreiner that the fence around the pits must stay up until the pits are closed. | Compliance Notice | |||
1118061940 | 2005-05-25 | The drilling pits have been pumped down in anticipation of solidfying the pits next week. No violations at this time. | ||||
1144350171 | 2006-04-04 | Status check inspection found that the well was in production but the required fencing was not installed and the well identification had not been posted. Additional grading and seeding is also required before the preliminary restoration is approved. Restoration was due by the end of February. | ||||
1540592481 | 2014-12-09 | I inspected this well on 12/9/2014. The well is located in a residential setting. There is graveled access road to the tank battery and well head. The well is produced utilizing an electrified pump jack. The pump jack was fenced, but not secured with a lock. The required signage on the pump jack fence was missing. Operational conditions surrounding the well head were typical of a pumping operation. The tank battery was fenced and locked. The required signage was missing from the tank battery. The tank battery consists of a 100 barrels oil tank, 25 barrel steel brine tank and a 2408 horizontal mechanical separator. DOM / EOG has a gas measurement meter within the tank battery. Locks and / or plugs were absent from the liquid load lines. There is an unsecured dump line standing in the air, as if a tank had been removed. Last reported production was for the year 2013. The Operator shall : 1.) post the required signage ( Urban rules ), 2.) place locks on all load lines and gates, 3.) remove the unused dump line and any unnecessary equipment lying around. These compliance measures shall be completed and approved by the DOGRM Inspector by 1/15/2015 | ||||
1650538190 | 2005-05-18 | G&H has started drilling. The pit is lined and in good condition. The surface hole will be drilled with fresh water mud. | ||||
1711317175 | 2006-07-12 | Preliminary restoration is approved. | ||||
-2064294351 | 2005-05-17 | On site to witness pit construction. The depth, size and condition was not acceptable and a track hoe was scheduled for Wednesday May 18 to finish the pits. A re-enforced liner was also ordered. I will inspect the pits again on 5/18. | ||||
-683687566 | 2005-05-19 | G> & H. Drilling Set surface. | ||||
-878944787 | 2006-03-13 | The well is in production. I contacted Mike Schreiner and told him that he needs to post the required ID, install the fencing around the well and the fencing around tank battery before the wells go into production. He said that he would contact Southway Fence to finish installing the fence and that he would post the required ID. | ||||
963495303 | 2006-04-25 | The fence has not been placed around the wellhead and tank battery as required. |
For data sources see[2]