If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-093-60640 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.40493333,"lon":-82.03344553,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: | |
Configuration: | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 41.40493333 | |
Longitude: -82.03344553 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1292742948 | 2015-04-27 | Visited location on 04/27/2015 to complete plugging operations at the Carney #1 well. Ron, Joe, and Jake Gibson (Gibson & Associates) arrived shortly after. Top of cement stayed at approximately 3' below ground level. Placed steel plate on well, and filled cellar and covered well with soil. Plugging operations completed. | ||||
563716985 | 2015-04-16 | Visited location on 04/20/2015 to witness plugging operations at the Carney #1 well. R.A. Gibson & Associates was on location, rigged up. The well had been bailed dry over the weekend. One bailer run was made prior to my arrival. Made an additional bailer run which recovered ~1-2 gallons of fluid. Rig down. Rig up Alexis Concrete. Fill well from TD to top of casing with 9-sack grout through a funnel. Rig down move out Alexis Concrete. No issues were encountered during the plugging of the well. |
For data sources see[1]