If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24525 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44131533,"lon":-82.41075396,"icon":""}]} |
County: Knox | |
Municipality: | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-09-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.44131533 | |
Longitude: -82.41075396 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 388.0 | 747.0 | ||||
2012-0 | 1925.0 | 1690.0 | ||||
2013-0 | 1148.0 | 1002.0 | ||||
2014-0 | 837.0 | 365.0 | 880.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1612775979 | 2011-09-19 | Inspect drill site. Set and cement Surface casing. During cementing of casing, belt on deck motor broke. Cement company washed out all cement. And, called for a replacement rig and reloaded with bulk cement. | ||||
2071551281 | 2011-09-20 | Inspect drill site. Current depth of 912 feet. | ||||
2122316914 | 2011-09-19 | Cementing of surface casing. After belt on deck motor broke, cement was washed out. Replacement truck was requested. Operator called with notification cement job was completed and plug was down at 6:00 am, and testing of BOP will be at 6pm. | ||||
248420303 | 2013-04-25 | This well is a producing well. |
For data sources see[2]