Well ID: 34-111-24363 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81828865,"lon":-81.30412818,"icon":""}]} |
County: Monroe | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-01-11 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.81828865 | |
Longitude: -81.30412818 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 590468.0 | 0.0 | ||||
2013-6 | 0.0 | 116.0 | ||||
2013-9 | 670426.0 | 111.0 | ||||
2014-1 | 332876.0 | 89.0 | 0.0 | 89.0 | ||
2014-3 | 287366.0 | 92.0 | 0.0 | 92.0 | ||
2014-2 | 382351.0 | 91.0 | 0.0 | 91.0 | ||
2014-4 | 203033.0 | 92.0 | 374.0 | 92.0 | ||
2015-1 | 163097.0 | 90.0 | 1181.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1129989336 | 2013-02-07 | Inspector on site 6 hours to witness the running and cementing of the 13.375 1st intermediate casing string. 2035' of casing was set and cemented back to surface with 2213 sacks of class A cement used with the company using 100% excess. The casing was tested to 1200 psi with no recorded pressure loss. | ||||
-1131486001 | 2013-01-30 | I received a call @ 2:30 Am that the Surface casing bore hole total drilling depth had been reached and that they would be setting and cementing surface @ 7Am. Upon arrival the company man stated that they would not be ready for several hours and He would call me when they were ready to cement. | ||||
1357922912 | 2013-01-11 | Inspector on site to witness the setting of the tin horn and begging of the conductor hole drilling. A 5' wide x 6' deep tin horn was set and 100' of 24 conductor is on location to be set and cemented back to surface in a 30 borehole. | ||||
1358184844 | 2013-01-14 | Inspector on site to check on status of the top hole rig attempting to set the 24 conductor pipe. The rig is currently broke down and being repaired. | ||||
1358226866 | 2013-01-15 | Inspection found the well spudded on 01/11/2013 and inspector on site to witness the setting and cementing of 100' of 24 -94# conductor pipe on 01/14/2013 @ 10:00PM and off location @ 1:30AM. Circulation was established prior to cementing with the cement displaced to 80' inside the casing and good cement returns to surface inside the cellar. Inspector will note that the cellar floor was sealed at a thickness of 10 at the time that the conductor was set. | ||||
1359416848 | 2013-01-28 | Inspection found the current drilling depth to e 135' using a 22bit. Inspector will note that the company is drilling the surface bore hole and will be running approximately 380' of 18.625 surface pipe. | ||||
1359638568 | 2013-01-30 | Inspector on site to witness the running and cementing of the 18.625 surface pipe. My initial phone notification received at 2:30 AM was for a 7:00 Am callout to cement surface. Upon arrival the company man stated that they would not be ready to start running casing until after 12:00Pm; Upon re arrival at 1:00pm the drilling rig was starting to run the 392' of 18.625. The surface pipe was hanging up inside the conductor and at 7:00 pm the company decided to pull the surface and ream the conductor. I then left location and informed the company man to call me when the pipe was on bottom and the cementers were hooking up. | ||||
1359661107 | 2013-01-31 | Inspector on site to witness the cementing of the 18.625 surface casing. On this day 386' of 87 Lb casing was set and cemented to surface with circulation established prior to cementing and 45 barrels of cement returns to surface and the casing pressure tested to 500 PSI over lift pressure upon the landing of the plug. All casing tally and cement job records received. | ||||
1360152099 | 2013-02-06 | Notification was received @ 7AM that the current well bore drilling depth of 2035' using a 17.5 bit has been reached and that the drilling company was conditioning the hole. In preparation of pulling out of the hole with the drill string to run and cement the 13.375 casing back to surface. | ||||
1360596736 | 2013-02-11 | Upon inspection the current drilling depth was found to be 4134' using a 12.250 drill bit with the projected depth to be 7000' and the next casing sting to be set is 9.625. All measurements are off of a 25' Kelly bushing. Records were received from the BOP test on the 13.375 casing. Inspector will note that notification was made to the company environmental representative that several of the disturbed areas needed to be seeded and mulched. | ||||
1360784786 | 2013-02-13 | Inspection of the drill site found the current drilling depth to be 5160', The next casing string to be set is the 9.625 at a approximate depth of 7000'. Inspector will note that notification was made to Greg Mayle who is the Company E&S Coordinator in regards to several locations on the site that will need erosion control and one place on the south west face of the drilling pad that has began to slip, I made Mr. Mayle aware that the surface was beginning to erode at several places on the site that have not have had proper cover or erosion control drainage established. | ||||
1361278691 | 2013-02-19 | Status check inspection on the drilling progress found the company drilling on water base fluid @ 6771' with a projected total depth of the 9.625 intermediate string to be 7053'. Inspector will note that the company is addressing issues dealing with vegetation and erosion around the perimeter of the drill site brought to their attention by myself. | ||||
1361453025 | 2013-02-20 | Status check inspection on the drilling progress found the current drilling depth of 6834' using a 12.250 bit; with the current proposed depth of this well bore stage to be 7053'. Inspector will note that the company is having trouble with the drill bit and has only made 63' of hole in the last 24 hours and is waiting on a bit engineer to arrive to suggest their next recommended action. | ||||
1361556828 | 2013-02-22 | Status check inspection found the current drilling depth to be 7095' and the company logging the formations to evaluate the current depth. The 9.625 intermediate casing string is the next to be set. | ||||
1361922454 | 2013-02-25 | Inspector on site 10 hours to witness the cementing of the 9.625 intermediate casing from 7090' to the 2 stage tool set at 4633'. The plug was landed and the float collar not holding so the cement head was shut in and the cement allowed to cure for 8 hours. 600 sacks of class A cement was used with the casing pressured to 1200 psi upon landing of the plug. 20% Cement excess was ran. | ||||
1362247460 | 2013-03-02 | Status check inspection on the current drilling progress found the current drilling depth to be 8065' with the company drilling with oil base mud. | ||||
1362580652 | 2013-03-06 | I received a call at 9:15 AM from the company safety representative stating that they had spilled approximately 1/2 a barrel of oil based drilling mud at their Norman drilling site. The company man commented that a majority of the spill was inside their lined working containment area and was immediately cleaned up with 100% recovery. I advised them I was on a cement job and seeing how they had contained and recovered the material I would be over to look at the site within 2.5 hours. Met with Greg Male @ 11:30AM and observed the area outside the containment area had been cleaned up by drawing the material up with a vacuum truck, We discussed recovering the sheen with spill rags and cleaning the equipment affected by hand as not to cause the product to migrate under the rig mats. | ||||
1362592396 | 2013-03-06 | Status check inspection on the current drilling progress found the current drilling depth to be 12,064' in the horizontal section using a 8.5 bit and drilling on oil base mud to a proposed well bore depth of 14,028'. | ||||
1362695944 | 2013-03-07 | Status check inspection found the current drilling depth to be 12,442' and the company working to increase their mud weight to control downhole formation pressure they are encountering. | ||||
1363178013 | 2013-03-13 | Inspection and status check found the well bore total drilling depth has been reached and the company currently running the 5.5 production casing. Casing records received and the company anticipates they will be ready to cement sometime in the next 16 hours. | ||||
1363285007 | 2013-03-14 | Inspector on site 4 hrs to witness the setting and camenting of the 5.5 production casing. | ||||
1367849892 | 2013-05-06 | Inspector on site to witness the 4th of 21 stages to be stimulated. The 5.5 casing was perferated from 13,283' to 13,095' with 60 shots. A stimulation report was received and entered. | ||||
1411365900 | 2013-03-11 | Status check inspection on the drilling progress found the current depth 14,153' with the total well drilling depth reached and the company conditioned the well bore in anticipation of running the production casing within the next 24 hours. | ||||
1587402767 | 2013-12-13 | The well is in production and on line, The company has completed 3 wells on the pad and is currently in the process of drilling 3 more. | ||||
-1951254183 | 2013-02-15 | Inspection of the drill site and status check on the drilling progress found the current drilling depth to be 5573' using a 12.250 bit with a proposed depth for this 9.625 intermediate string to be 7000'. Company is drilling on water based mud. | ||||
-1996731299 | 2013-10-30 | Inspection found the well capable of production and 8- 400 barrel production tanks located on site. | ||||
-279502597 | 2013-12-12 | Bill Stolarik and I stopped in at the location and inspected the site. Well is in production. Tanks, dike and identifications are in place. | ||||
-325930145 | 2013-02-26 | Inspector on site 5 hours to witness the cementing of the top stage of the 9.625 casing cement job from 4633 to surface. The 2 stage tool relief plug was dropped and the circulation established prior to cementing with 1211 sacks of class A cement ran with 40% excess cement used. The plug was landed and the casing pressure tested to 500 psi over lift pressure. Cement returns to surface. Inspector has explained to the company men over the site construction that proper erosion control needs to be established on the soil stockpile area and that even though vegetation understandably cannot be achieved in the winter months erosion control still must be in place. | ||||
-933498821 | 2014-07-30 | Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production. |
For data sources see[2]