Well ID: 34-175-20344 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.97303403,"lon":-83.18435178,"icon":""}]} |
County: Wyandot | |
Municipality: | |
Operator Name: NORSTAR OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-04-01 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Final Restoration | |
Violations: 0 | |
Latitude: 40.97303403 | |
Longitude: -83.18435178 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1543376881 | 2005-04-18 | Inspect location. Pits filled site graded. Crop field. | ||||
1587742088 | 2005-03-31 | Inspect Site. Drilling, conductor set at 174 feet. | ||||
1953007992 | 2005-04-08 | Plug well. Shoot pipe at second collar above calculated free point of 2037. First collar at 2037, second collar shot off at 1994. Pull up 2 to 3 feet and set 100foot plug, and subsequent plugs for closing well. | ||||
422939706 | 2005-04-01 | Set surface casing at 706 foot. | ||||
-692258637 | 2005-04-07 | Attempt to set bottom plug. A 330 foot plug was attempted to be set from 2358 to 2028 with 88 sacks cement in a 7 inch hole using 2 inch upset tubing. During the cementing process the cement setup and locked tubing in place Free point was calculated by stretch of 40K lb with 25 of stretch at 2027 feet. Upon determination of cemented in pipe circulation of upwards of 145 bbl water to wash out cement plug. Circulation of water was maintained throughout. Suspect channeling occurred. Reverse circulation was attempted to free pipe. Pipe would need to be shot. |
For data sources see[1]