If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21141 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.17341456,"lon":-81.22683369,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-03-05 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.17341456 | |
Longitude: -81.22683369 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 171489.0 | 18299.0 | ||||
2013-9 | 70720.0 | 9939.0 | ||||
2014-3 | 80434.0 | 92.0 | 6069.0 | 92.0 | ||
2014-1 | 120695.0 | 84.0 | 8235.0 | 84.0 | ||
2014-2 | 89983.0 | 78.0 | 7626.0 | 78.0 | ||
2014-4 | 65266.0 | 88.0 | 2088.0 | 88.0 | ||
2015-1 | 45863.0 | 78.0 | 2102.0 | 78.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1168181237 | 2013-10-15 | The site passed preliminary restoration according to 1509.072A. | ||||
1364308472 | 2013-03-26 | I am on site today to witness the running and cementing of the 13-3/8 inch casing string. Yost Drilling Rig # 7 has drilled a 17.5inch diameter hole to 1762 ft. and set 1722 ft of casing. Stingray Cementing service c/w 1390 sks of class A 15.6 lb cement. I witnessed 25 bbls of good cement returns to surface. | ||||
1364309314 | 2013-03-22 | On the day of my inspection I covered a surface job. 18.625 casing was ran and cemented with good cement returns. See cement ticket for details. No violations noted. | ||||
1366824737 | 2013-04-24 | I am on site today to plug the 12-1/4 inch diameter section of the well back. Schlumberger Cementing is plugging back today from 6977 ft in 500 ft stages. 6977 ft to 6477 ft pull up 500 ft. 2 nd plug from 5977 ft to 5477 ft then pull up again 500 ft. 3 rd plug from 4977 ft to 4477 ft pull up 500 ft. Set 4 th plug from 3700 ft to 3277 ft. Shut in for 24 hours. Then Sidewinder M- 60 will re-drill this same section and try to keep from going outside the Hardline or drill corridor. | ||||
-19283136 | 2013-03-07 | Stringray Cementing cemented 115' of 26 casing with 250Sacks of Class A cement. See the Casing Ticket for more information. | ||||
985016475 | 2013-03-29 | On the day of my inspection I picked up a cement ticket from previously witnessed 18.625 casing job. Mark Moreland was present to witness 13.375 cement job. No violations noted. |
For data sources see[2]