If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.70975857,"lon":-81.9571753,"icon":""}]} |
County: Morgan | |
Municipality: | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-04-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.70975857 | |
Longitude: -81.9571753 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-0 | 279929.0 | 365.0 | 908.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1314406500 | 2013-06-03 | I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The pit was filled and there were dozers on location smoothing out the road and well location. The wellhead is shut in until they install production lines. | ||||
1365036757 | 2013-04-03 | I was on location to witness the cementing of the conductor casing by Formation Cement Company. There was good returns on the cement job. | ||||
1365175220 | 2013-04-05 | I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 719'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 644'. The operator encountered hard sandstone with fresh water at 601-632 which slowed drilling earlier. Formation cement on location. The plug was down at 10:55am with good cement returns, and casing pressure was held at 600 psi for 5 minutes. | ||||
1375900083 | 2013-08-07 | The well is currently shut in however the lines have been buried and tied into a new separator and tank up at top of acces road. There is a good dike around the tank. Operator still needs to seed and mulch location. | ||||
798706389 | 2013-09-26 | Preliminary restoration is passed in accordance to 1509.072. |
For data sources see[2]