If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-25584 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.54719695,"lon":-82.02677906,"icon":""}]} |
County: Holmes | |
Municipality: | |
Operator Name: X STATEMAN SERVICES | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-06-16 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.54719695 | |
Longitude: -82.02677906 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 16.0 | 38.0 | ||||
2013-0 | 10.0 | 37.0 | ||||
2014-0 | 12.0 | 365.0 | 40.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1005986486 | 2012-03-14 | Drilling ahead at 676' Top of Berea at 673'. Good show of oil. | ||||
1034512592 | 2011-08-31 | Drilling ahead at 265'. Will set surface next week. | ||||
111434384 | 2012-03-05 | 590' drilling ahead. | ||||
-1232530922 | 2012-01-18 | No activity. No further progress made. | ||||
1324557167 | 2011-12-21 | No activity. | ||||
1328271074 | 2012-02-02 | Drilling ahead at 491' | ||||
1331207149 | 2012-03-07 | Drilling ahead at 630' | ||||
1331917001 | 2012-03-16 | Drilling at 688' in 2nd Berea. | ||||
1332415247 | 2012-03-21 | The rig is at 740', broke down and repairing the hand clutch. | ||||
1475163847 | 2012-03-15 | No activity today. 13 psi on well. | ||||
-1629232155 | 2013-03-27 | This is a producing Berea pump jack well. There were no problems noted at the time of the inpsection. The STATUS of this well is PR (Producing) | ||||
1670908925 | 2012-02-07 | drilling ahead at 535 | ||||
1685009755 | 2013-08-07 | This is a producing pump jack well. There were no problems noted at the time of the inspection. | ||||
1686979793 | 2011-06-13 | Rigged up, rope socket set. | ||||
1696507736 | 2011-05-23 | Checked out pit and location where they are rigging up a spudder. | ||||
-1819473717 | 2012-03-13 | Drilling ahead at 673'. | ||||
-1957593791 | 2012-02-06 | drilling ahead at 521' | ||||
-1988057556 | 2011-07-06 | Still driving pipe. | ||||
-2074835183 | 2011-06-27 | Spudder is still driving pipe. No activity when there. | ||||
-2075437287 | 2014-04-09 | This is a producing pump jack well. There were no problems noted at the time of the inspection. | ||||
215989747 | 2012-03-19 | Drilling ahead at 715'. Estimated TD will be 800'. | ||||
263370827 | 2011-10-28 | No one there but progress is being made. | ||||
274055045 | 2011-06-03 | Spudder on location but not yet rigged up. | ||||
-281728432 | 2012-03-27 | Both pits were emptied and backfilled this date. | ||||
-314720749 | 2011-11-09 | Drilling ahead below surface pipe. | ||||
377909091 | 2011-11-10 | Drilling ahead at 365'. | ||||
-412213521 | 2011-08-03 | Drilling | ||||
-425719824 | 2011-10-11 | Grout in 8.625 and 5.5 annulus stayed up. Drilling ahead. | ||||
-521421021 | 2012-04-12 | The pits have been emptied and back-filled but not leveled up. The well is producing. | ||||
-616228387 | 2011-05-31 | Met operator and talked again about pits and when they plan to spud. | ||||
-622412102 | 2012-03-23 | Reached total depth of 800' on 3/22/12. Berea 673-707'. | ||||
-629049355 | 2011-10-17 | Drilling out cement in surface casing. | ||||
-732524079 | 2012-04-16 | The pits have been leveled and farmer the has prepared the field for planting. Preliminary Restoration passed. The well is producing. No problems noted. | ||||
-786922475 | 2012-03-29 | Ran tubing and rods. Well is complete. | ||||
826813176 | 2012-01-04 | There has been no activity. The rig is at 456' deep and they are drilling when weather permits. | ||||
-893150570 | 2015-04-29 | This is a producing pump jack well. (Berea) There were no problems noted at the time of the inspection. | ||||
-897663348 | 2012-01-25 | No progress made. Redressed 5 bit on location. |
For data sources see[2]