34-029-21838

Well Details

Well ID: 34-029-21838
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-11-27
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.68523618
Longitude: -80.91512212

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 146372.0 48.0 1102.0 48.0
2015-1 172937.0 89.0 451.0 89.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1395752928 2014-03-20 I was at the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1938
1396988369 2014-03-29 I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1923
2037373356 2014-12-11 I was onsite to conduct a preliminary restoration inspection. There are a total of six wells on the pad. Access road entry is on east side of Nature Road NE approximately 1.17 miles south of Merline Road NE. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a padlocked gate at the entrance of the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a
-532190523 2013-11-29 I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole for the Pitts 22-14-4 #5. The bit was stuck down due to a mechanical failure, and the rig crew was working to free the bit. A second rig was in the process of drilling the Pitts 22-14-4 #10, and was at 35
783991458 2013-12-02 I witnessed the cementing of the conductor casing. Precision Rathole drilled a 30

For data sources see[2]