Well ID: 34-105-23677 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.13731296,"lon":-81.89569128,"icon":""}]} |
County: Meigs | |
Municipality: | |
Operator Name: MOUNTAINEER STATE OPER LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-09-19 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.13731296 | |
Longitude: -81.89569128 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 18.0 | 0.0 | ||||
2013-0 | 0.0 | 0.0 | ||||
2014-0 | 0.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1244569509 | 2012-12-04 | Follow up to inspection 385780457. Pits filled, no erosion, no equipment on site, vegetative cover has returned. | ||||
1316438664 | 2011-09-19 | Drilling status check. Spudded today and 22 feet of drive pipe set in bedrock. Pit construction looks good and large enough to handle water from Injun. 30 feet of surface borehole drilled now. | ||||
1316613904 | 2011-09-20 | Running surface casing into hole. Last two joints don | ||||
1319463839 | 2011-10-21 | Witnessed most of frac job on Gruesser well. 1978 PSI - breakdown, ~1000 PSI at 12.5 Bbl/min. When the water source was switched from pit to tanks, cuttings began to clog perfs. Pressured up to 2500 PSI and well was blown off in an attempt to clean out perfs. Attempted five times before success. | ||||
-1481718940 | 2012-05-21 | Met with Tom Stone of Mountaineer State Operations to discuss erosion issues at well and remediation. | ||||
1499898447 | 2012-01-27 | No violations were noted. | ||||
1518360589 | 2012-09-27 | Inspection #757969285 has been voided because violation was given verbally. A written violation is being issued to the company today. | ||||
1552864618 | 2011-09-22 | Kerry Brown of Monroe drilling let me know the hole had bridged off when the wire log had been run. Longstring to be delayed. | ||||
-212780482 | 2012-11-13 | Follow up to inspection 385780457. The area has been graded, water bars have been emplaced along the road, and the area has been seeded and mulched. Grass is returning, but has covered less than 5% of the well site. | ||||
385780457 | 2012-09-27 | Failure to complete the initial restoration requirements as required under division (A) of section 1509.072 of the Revised Code. An area around the wellhead and along the uphill and downhill sides of the site is void of vegetative cover. The owner or the owner's agent shall grade or terrace and plant, seed, or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. Failure to comply with in the given time period will result in a material and substantial violation. | ||||
-38659367 | 2011-09-26 | Called Tom Stone with Mountaineer State to see what depth of Berea Sandstone was. | ||||
-465001405 | 2011-09-07 | Predrilling site review with Tom Stone of Mountaineer State Oper LLC. | ||||
636871646 | 2012-06-25 | Erosion is under control. | ||||
-699495920 | 2012-01-23 | Inspection revealed small oil leak on 2 inch line between mechanical separator and 100 barrel steel tank. Oil contamination radius is 1.5 feet around the 2 inch line. Took photos. Informed Tom Stone Mountaineer Field Supervisor of the leak, and instructed him to fix the leak and clean up the oil. | ||||
757969285 | 2012-04-27 | There is erosion running down the hill roughly 120 feet. No vegetative cover has been established. Area shall be graded and vegetative cover shall be established in order to prevent erosion. There is a bailer on site next to the well. All drilling equipment shall be removed. | ||||
-814375289 | 2012-10-31 | Follow up to inspection 385780457. The ground has been smoothed. The area has been reseeded and mulched. Vegetative cover has not yet been established. I will return on the due date to check for vegetative cove. | ||||
840269341 | 2011-09-20 | John Kent called and scheduled a Annular Disposal Mechanical Integrity Test (Fresh Water Test) on the surface casing. Test pressure 343 psi. 1st test (at 345 psi) lost 25 psi in 5 minutes. 2nd test (at 355 psi) lost 75 psi in 15 minutes. No further tests were done. | ||||
-868784687 | 2011-09-20 | Surface cement job. Ran 682 feet of new 26 lb 9 5/8 inch surface casing in 690 feet of 12 1/4 borehole. 265 sacks of class A, 300 lb gel, 800 lb accelerator, 240 lb LCM, with 60% excess. Circulation established and good cement returns stayed at surface. | ||||
974494694 | 2011-12-21 | Pits filled for two month preliminary restoration requirement. Some areas seeded and mulched, not all. Tank battery has been placed 50 feet from road. Well in production but ID has not been placed. Spoke with Tom Stone about ID. |