34-129-20214

Well Details

Well ID: 34-129-20214
Loading map...
County: Pickaway
Municipality:
Operator Name: HOUGHTON INVESTMENTS, L.L.C.
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-02-15
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.59662792
Longitude: -83.06830271

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2007-0 0.0 789.0
2008-0 0.0 330.0
2009-0 0.0 192.0
2010-0 0.0 153.0
2011-0 0.0 195.0
2012-0 0.0 0.0
2013-0 0.0 0.0
2014-0 0.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1126999516 2007-05-01 #NAME?
115239877 2008-06-11 - ID on tank, pump unit operating while on site. Tanks and well area clean of debris.

- Water meter broken.

1173877714 2007-03-13 - On site for surface casing. Operator placing used 8.625 casing in 11inch drill hole, operator had trouble setting casing to depth. Driller welded all joints. Good circulation, rubber wiper plug used. Cement circulated to surface.
1175193751 2007-03-29 - Drill is currently stuck in hole in the Queenston formation. Have been stuck since Friday (3/23)

- met with driller, ask about discharging water from pits to wet land area. He said they had pump water from behind the pit liner. Will continue to keep a

1175691957 2007-04-03 - Drilling completed, rig moved off location, pits are still open some drilling debris on site. Area has been rough graded. Some drilling equipment located at end of lease road by township road.

- Small amount of crude oil in one of the drilling pit. - We

1176997933 2007-04-17 - On site for drilling progress, Buckeye Union Drilling contactor moved off location about 2 weeks ago. Dow Bowman moved on to complete hole, depth about 1,800 total depth about 2400 feet. Rig flushing hole while on site, drilling to start.
1231246819 2009-01-06 - Pump jack operating while on site. ID on tank. Dike area free of water.

- Water meter reading 313005 gallons = 74,525 barrels.

1245327535 2009-06-18 - ID on tank, dike area clean and free of debris. Pump jack not operating while on site.

- Water meter reading 525233 gal. = 12,505 barrels, water is dispose into UIC well 34-129-2-0194

1304524378 2011-04-21 - ID on tank, tanks contained in dike area. Pump jack operating while on site.

- No violations

1417702250 2014-12-04 - On site for final restoration, pump unit and tanks have been removed. Dike area and well area has been graded and placed back into agricultural farm ground.

- Restoration will pass.

1522599932 2007-04-11 #NAME?
-1689608134 2007-02-20 - No one on site while inspection. Drill moved on location in the past week, moved from permit 209.

- Drill on location, pits dug and lined with plastic. Conductor casing set.

1711631245 2013-08-22 - Plugging report has been issued for well, date issued 12/24/2012 expires 12/24/2014.

- Pump jack has been removed, all pipe lines to tank have been removed. Tanks appears to be empty.

2 - 210 steel tanks and 1 - 100 steel tank in the dike area. 

- Weat

-1829007652 2014-06-10 Knox Energy on site pulling rods and tubing out of this well in preparation of plugging on 06/11/2014.
196915940 2013-05-08 - Plugging report has been issued for well, date issued 12/24/2012 expires 12/24/2014.

- Pump jack has been removed, all pipe lines to tank have been removed. Tanks appears to be empty. - Weather condition; partly sunny Temp. 60's wet ground condition.

-357532951 2014-06-12 Knox Energy has moved there service rig in on this well to plug it. I am onsite to witness the plugging of this well. Formation cementing is the company being used to cement the well. The bottom plug was set through the 2 tubing. A 600ft bottom plug was set. They then pulled out the tubing and set up to rip the 4. The rig crew was able to rip the 4 at 1500ft. After the rig crew pulled 90ft of 4 they set 150ft rip plug. They then pulled the 4 up to 700ft to set the 8-5/8's plug. A 200 foot plug was set at the bottom of the 8. Then the 4 was pulled up to 150ft to set the surface plug. The cement stayed at the surface.
-59109008 2007-05-30 - On site for preliminary inspection. Pump unit in place, operator has place 2 - 210 barrels oil tanks and 1 - 100 barrel water tank in dike area.

- Area around well and dike has been graded, and corn has been replanted in this area. - GPS taken at well

638398857 2008-09-10 - Pump unit operating while on site, ID on tank. Water meter reading 142718 gallons = 3390 barrels.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.