If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22586 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6860039,"lon":-81.00453412,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-04-23 | |
Unconventional: | |
Configuration: | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.6860039 | |
Longitude: -81.00453412 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 145842.0 | 65.0 | 8863.0 | 65.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1412623346 | 2014-05-01 | I was on location at 8:37am to witness the cementing of the 13.375 surface casing. Wyoming casing was just picking up the shoe track and going into the hole. Nomac Rig #73 drilled a 17.5 hole to a total depth of 760'. The casing was landed at 750' and O-Tex rigged up the cement head. The casing was cemented with 690 sacks of Class H cement. The plug landed and the casing was pressure tested at 950psi for 5 minutes. 40 barrels of cement circulated to surface during the job and the floats held. No violations. See cement report for more details on this job. | ||||
-562145786 | 2014-05-04 | Status check inpection after cementing conductor casing on the #205H in front of the drilling rig. Nomac #73 was at a depth of 5,107' with the 8.75 hole. They are currently shut down and servicing the top drive on the rig. All equipment is on contaiment and the location is in good order. No violations. | ||||
731267608 | 2014-05-03 | I was on location at 3:15am to witness the 9.625, intermediate casing cement job. Nomac Rig #73 drilled a 12.25 hole to a depth of 2,162' and Wyoming Casing landed the pipe at 2,153'. O-Tex Pumping rigged up and cemented the casing with 780 sacks of Class H cement. They dropped the plug and displaced the plug to the collar with 158 barrel of freshwater. The plug landed, passed the pressure test, and the floats held. 36 barrels of cement circulated to the surface. No violations. See casing ticket for more details on this job. |
For data sources see[2]