If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23036 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12016441,"lon":-81.55462945,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-04-16 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.12016441 | |
Longitude: -81.55462945 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 1316.0 | 413.0 | ||||
2009-0 | 25901.0 | 718.0 | ||||
2010-0 | 17141.0 | 365.0 | ||||
2011-0 | 16257.0 | 466.0 | ||||
2012-0 | 16217.0 | 488.0 | ||||
2013-0 | 13684.0 | 298.0 | ||||
2014-0 | 10254.0 | 365.0 | 333.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1196514919 | 2008-05-13 | The drilling pits are still open, lined and fenced. | ||||
-1525192139 | 2008-04-15 | Union Drilling Rig 24 is moving on site and should spud the well later tonight. During the move, a truck belonging to Tiger Trucking caught an overhead power line, snapped the pole and broke open an electric transformer. Both Ohio Edison and OEPA-DERR responded to the incident. | ||||
1820019458 | 2008-04-16 | Union Drilling Rig 24 is drilling surface hole and should be ready to set surface casing later tonight. The drilling pits are lined and fenced. No violations at this time. | ||||
-1911609563 | 2008-12-11 | The well is in production. The ID is posted at the entrance gate and the entire property is fenced. Preliminary restoration will be required by the end of January. The affected area needs some additional seeding. | ||||
196461727 | 2008-05-23 | The drilling pits have been solidified and covered over. No violations at this time. | ||||
-200873610 | 2008-05-07 | J-Well and Universal Well Service are on site to frac the well. The drilling pits are open, fenced, lined and in good condition. No violations at this time. | ||||
233079355 | 2008-04-18 | Union is drilling ahead. The pits are lined, fenced and in good condition. | ||||
-305324968 | 2008-04-23 | Union is drilling ahead. The pits are lined, fenced and in good condition. | ||||
399517687 | 2008-04-30 | Union Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard. | ||||
-672249506 | 2009-06-04 | Preliminary restoration is approved. |
For data sources see[2]