If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-27412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8032158,"lon":-82.12398872,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-10-24 | |
Unconventional: | |
Configuration: | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 39.8032158 | |
Longitude: -82.12398872 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1147417474 | 2014-11-14 | I stopped by to see how the rig was getting along. The rig is currently drilling at a depth of 2200ft. They plan on setting production at the beginning of next week. | ||||
1414592954 | 2014-10-27 | I went out to this well to witness the cement job on the surface casing. Kilbarger has ran the 8-7/8 surface casing in the well to a depth of 917ft. Formation was onsite to cement the pipe back to the surface. They used 250sks of class A cement to cement the pipe in. There was a total of 10bbls returns to the surface. They put 700lbs of pressure on the well for the pressure test. The test was a success. | ||||
1816534838 | 2015-05-15 | The Preliminary inspection passed inspection. | ||||
-552009293 | 2014-10-29 | I stopped by the drilling rig today to check on there progress. They were drilling during the time of my inspection. They were at a depth of 2155ft. I did a walk around inspection while I was onsite to make sure there were no violations. |
For data sources see[1]