If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24450 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88136625,"lon":-81.40427153,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-10-18 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.88136625 | |
Longitude: -81.40427153 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 501183.0 | 92.0 | 25975.0 | 92.0 | ||
2014-2 | 455645.0 | 57.0 | 32109.0 | 57.0 | ||
2014-4 | 334811.0 | 89.0 | 7973.0 | 89.0 | ||
2015-1 | 272296.0 | 90.0 | 9684.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
142632912 | 2014-01-30 | My inspection finds the drilling rig is running 5.5 casing at a depth of 13904'. The rig is placing centralizers on predetermined joints. They will be cementing sometime tonight. | ||||
1427123561 | 2013-11-01 | My inspection today finds the rig, Falcon 20, ran 407' of 18.635 casing. Allied cemented the casing in place with 176 bbl of class A cement. | ||||
2132416106 | 2014-01-31 | I stopped at the rig to pickup the cement tickets for the 5.5 casing. The rig is preparing to move to another site on the same lease road. | ||||
-44889849 | 2014-01-27 | My inspection today finds the rig is drilling a 8.5 hole at a depth of 16987'. The anticipated Total depth is 17000'. | ||||
913897933 | 2014-05-14 | My inspection today finds the well appears to be in production. The tank battery consists of eight 400 bbl tanks set in a containment. The site meets preliminary restoration requirements. | ||||
-965679513 | 2014-01-21 | My inspection today finds the rig is drilling an 8.5 hole at a depth of 10561'. |
For data sources see[2]