34-019-22150

Well Details

Well ID: 34-019-22150
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-07-12
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.48525574
Longitude: -80.96350635

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 163635.0 428.0
2013-6 28880.0 333.0
2013-9 246646.0 1413.0
2014-3 100321.0 92.0 61.0 92.0
2014-1 144941.0 90.0 216.0 90.0
2014-4 88134.0 90.0 70.0 90.0
2014-2 111009.0 89.0 171.0 89.0
2015-1 73627.0 79.0 109.0 79.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1342396646 2012-07-15 I was on site to witness the cementing of the 9 5/8 intermediate casing. Nomac Rig #41 reached a total depth of 2012' and ran 47 joints of 40#, 9 5/8 casing to a depth of 2012'. They installed 17 centralizers on this casing string. Halliburton cemented the 9 5/8 casing with 750 sacks of Class A cement with 1/4 #/sack Floseal and 12% salt. Good circulation throughout the job and 22 barrels of cement circulated to surface.
1343056281 2012-07-23 I was on site to check the status of Nomac Rig # 41 and check the status of Express Energy Services conductor rig drilling the other Elwood wells conductor holes. My inspection revealed that Nomac #41 is drilling the curve at 8203'. Express Energy Services is drilling the conductor holes and mouse holes for the # 8 and # 10 wells. Shawn with Express Energy Services advised that it would be later today or this evening before they were ready to cement the conductor on these two wells.
-1690206565 2012-07-13 I was on site to witness the cementing of the 13 3/8 casing. My inspection revealed that Nomac Rig #41 has drilled a 17.5 hole to a total depth of 573' and ran 573' of 13 3/8 casing with 6 centralizers installed on the casing string. Halliburton cemented the 13 3/8 casing with 540 sacks of Class A cement (1% CaCl and .25 #/sack Floseal). There was good circulation throughout the entire job and there was 24 barrels of cement circulated to surface.

For data sources see[2]