If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24575 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84704957,"lon":-81.24547863,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2015-03-24 | |
Unconventional: | |
Configuration: | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 39.84704957 | |
Longitude: -81.24547863 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1427219629 | 2015-03-24 | The said well was spudded on 03/24/2015 by Rocky Mountain Drillings top hole rig with a 32 x 100' conductor borehole being drilled and 100' of 26 .375 wall weld connection conductor pipe being set. Express Energy Cement service is on location to cement the conductor with 330 sacks of class A-2% calcium .125 pps lcm 100% open hole excess cement with circulation established prior to cementing and good cement returns to surface. | ||||
1431098509 | 2015-05-08 | 05/08/2015 Patterson Drilling rig#342 is now on the hole and has drilled a 17.5 surface borehole to a depth of 1,291' with 13.375 54.5# casing ran and set to a depth of 1,291'. Halliburton cement service was on location to cement the casing using 271 sacks of class A (Halcem | ||||
1431693490 | 2015-05-15 | Status check inspection on the drilling process found Patterson drilling rig # 342 on location with the 12.250 intermediate well bore drilled to a depth of 7,532'with the borehole landed at a .35 degree inclination in the direction of 81.91 degrees azimuth, the rig currently is landing the last joint of 40# 9.625 casing to a depth of 7,532', Halliburton cement service is on location to cement the casing. | ||||
-992249882 | 2015-05-11 | Status check inspection on the drilling process found Patterson Drilling rig #340 on location drilling the 12.250 intermediate well bore at a depth of 2,824'. The company is implementing a 12 degree deviation in the directional azimuth of 187 degrees. |
For data sources see[1]