If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22199 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.29820203,"lon":-81.73582794,"icon":""}]} |
County: Cuyahoga | |
Municipality: | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-09-26 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.29820203 | |
Longitude: -81.73582794 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-0 | 19224.0 | 365.0 | 719.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1354056893 | 2012-11-27 | On my visit to this well today I was accompanied by Lake County Inspector Steve Tompkins. Our purpose was to observe the stimulation procedure for this well. A stimulation report has been filed in RBDMS. The well and its components are not installed for service at this time. A follow up inspection will be conducted in approximately 3 weeks. | ||||
1354816725 | 2012-12-03 | The visit to the well today was for the purpose if plugging the well back to the Clinton from the Trempealeau formation. A cement report has been recorded in RBDMS. An updated and corrected permit was issued through permitting. | ||||
-72632048 | 2012-10-02 | Drilling is continuing on this well, with rig drilling on fluid since 8/29/30. Vertical target is the Trempeleau at 5,800'. No problems, issues or incidents have been reported. | ||||
873132288 | 2012-09-26 | Site check for site construction management, pre site and permit conditions met. Set conductor casing 6:00 PM. |
For data sources see[2]