X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-26164

Well Details

Well ID: 34-089-26164
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2015-02-05
Unconventional:
Configuration:
Well Status: Final Restoration
Violations: 0
Latitude: 40.12154213
Longitude: -82.64220637

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1927847198 2015-05-21 Inspect location as part of a final restoration status check accompanied by Division intern Brittany Hupp. The location has been restored and equipment removed. Well location is in a crop field. Location meets ORC 1509.072 requirements. Time of inspection: 2:33 PM. Weather: 57*F, Cloudy
2019778349 2015-05-15 I witnessed plugging operations on this well. Berry Well Service plugging for Knox Energy. Cemenco was contracted to pump cement. Refer to plug report for details. Time of inspection: 10:15 AM Weather: 63*F, Cloudy
353515119 2015-02-05 I inspected this drilling location today. Kilbarger rig #5 rigging up during inspection. Bill Mitton was on location. The well will be spudded today. Time of inspection: 10:30 AM. Weather: 14 degrees F, Sunny, 1 snow
-600226807 2015-05-18 Inspect location as part of a final restoration. Equipment has been removed. The location was restored. A dozer was still on location. The restoration will be passed when dozer is removed. Division intern Brittany Hupp accompanied me on this inspection. Time of inspection: 4:00 PM Weather: 75*F, Cloudy
838240067 2015-02-11 This inspection was conducted as a status check. The well has been drilled and the rig has moved to a new location. The production casing was not run on this well as it has been decided that this well will be plugged. The well consisted of 8 to 2 swage with a valve in the closed position. No violations. Time of inspection: 1:06 PM. Weather: 35 degrees F, Cloudy
-989006160 2015-02-07 I witnessed the cementing of the 8 surface casing on Kilbarger rig #5 for Knox Energy. Mike Dickerson was on location for Knox Energy. Petroset Cementing was contracted to cement the casing. Kilbarger installed 558 feet of new 23 lb/ft. 8 casing inside an 11 hole. Petroset broke circulation and good cement returns were observed. Cement stayed at surface. A cement basket was not used. The cement ticket was received. Time of inspection: 7:50 PM. Weather: 40 degrees F, Clear

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.