Well Details

Well ID: 37-063-37062
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2011-03-21
Last Permit Date: 2011-03-21
Spud Date: 2012-01-10
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.432891
Longitude: -79.159908

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 5300.0 334.0 0.0 0.0 0.0 0.0
2012-0 3576.0 302.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 DRILLING FLUID WASTE 187.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 DRILLING FLUID WASTE 400.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 FRACING FLUID WASTE 1510.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 DRILLING FLUID WASTE 187.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 DRILLING FLUID WASTE 400.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 FRACING FLUID WASTE 1510.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2024534 2011-12-05 No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug.
2026867 2011-12-12 No Violations Noted U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe (7¿) was set at 1,525 feet and was cemented with 261 sks of Class A. Plug was down at 9:20 pm on 12/9/11with 8 bbls return. 75 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface. U.S. Energy was currently drilling at 2,810 feet for the production string. The anticipated depth is 4,974 feet.
2026879 2011-12-08 No Violations Noted U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 47¿ (sanded in place). Water protection (9 5/8¿) was set at 422 ft. and cemented with 160 sks of Class A. Plug was down at 8:37 am on 12/8/11with no return. Water was recorded at 130 feet. U.S. Energy was on standby until for the required 8 hrs. Cement time.
2033279 2012-01-11 No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12.
2034210 2012-01-13 No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/8¿) was set at 26 feet and sanded in. Water protection pipe (9 5/8¿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return. Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7¿) was set at 1,538 feet. U. S. Energy was waiting for cement delivery. Water levels were encountered at 65 feet and 400 feet. Coal seams were recorded at 85¿to 90¿ and 665¿ to 670¿ intervals.
2035246 2012-01-19 No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe (7¿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return. Production pipe was set at 4,639 feet. U.S. Energy completed gas well and was moving to next site.
2041224 2012-01-30 No Violations Noted Site visit was part of spud notification.

Access road was rocked and stable. Culverts were installed as noted on E&S plan. A corregated pipe was installed at the corner of the toe of slope near the access road. It was not actively discharging during inspection. It was also not noted on the E&S plan. The site id sign was incorrect. The permit number listed is invalid. PA DEP Water Quality SPecialist April Weiland was present during inspection.

2152271 2013-03-22 Indiana Burrell Twp No Violations Noted
2206279 2013-09-19 Indiana Burrell Twp No Violations Noted