If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37062 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.432892,"lon":-79.159908,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Burrell Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: SMITH DONALD 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-21 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.432892 | |
Longitude: -79.159908 |
Date | Event |
---|---|
2011-03-21 | New Permit Application |
2012-01-10 | Performed Spud Operation |
2012-01-18 | Drilling Completion |
2012-05-23 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 3,576.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 5,300.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 3,927.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 1,059.00 | 236 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 1,547.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 5,592.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,865.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,184.00 | 330 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | KRIEBEL MINERALS INC | Fracing Fluid Waste | 1,510.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 400.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 187.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2024534 | Primary Facility | 2011-12-05 | Drilling/Alteration | No Violations Noted | Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug. |
2026867 | Primary Facility | 2011-12-12 | Drilling/Alteration | No Violations Noted | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe (7¿) was set at 1,525 feet and was cemented with 261 sks of Class A. Plug was down at 9:20 pm on 12/9/11with 8 bbls return. 75 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface. U.S. Energy was currently drilling at 2,810 feet for the production string. The anticipated depth is 4,974 feet. |
2026879 | Primary Facility | 2011-12-08 | Drilling/Alteration | No Violations Noted | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 47¿ (sanded in place). Water protection (9 5/8¿) was set at 422 ft. and cemented with 160 sks of Class A. Plug was down at 8:37 am on 12/8/11with no return. Water was recorded at 130 feet. U.S. Energy was on standby until for the required 8 hrs. Cement time. |
2033279 | Primary Facility | 2012-01-11 | Drilling/Alteration | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12. |
2034210 | Primary Facility | 2012-01-13 | Drilling/Alteration | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/8¿) was set at 26 feet and sanded in. Water protection pipe (9 5/8¿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return. Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7¿) was set at 1,538 feet. U. S. Energy was waiting for cement delivery. Water levels were encountered at 65 feet and 400 feet. Coal seams were recorded at 85¿to 90¿ and 665¿ to 670¿ intervals. |
2035246 | Primary Facility | 2012-01-19 | Drilling/Alteration | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe (7¿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return. Production pipe was set at 4,639 feet. U.S. Energy completed gas well and was moving to next site. |
2041224 | Primary Facility | 2012-01-30 | Routine/Complete Inspection | No Violations Noted | Site visit was part of spud notification. |
2152271 | Primary Facility | 2013-03-22 | Site Restoration | No Violations Noted | At time of inspection, well in production. Well tag present. Brine tank sound. Access road in excellent condition. Installed culverts appear maintained, structurally sound. |
2206279 | Primary Facility | 2013-09-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well equipped for production. Site has been restored and permanently stabilized. No accelerated erosion observed. Vegetation growth is adequate across site. Tank appears structurally sound. Access road in good condition. Well tag present. |
For data sources see[7]