37-129-28795

Well Details

Well ID: 37-129-28795
Loading map...
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148819
Farm/Lease Name: MAMONT SOUTH 1C
First Permit Date: 2012-07-05
Last Permit Date: 2013-07-26
Spud Date: 2013-06-10
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.474766
Longitude: -79.569255

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 271442.78 45.0 0.0 0.0 0.0 0.0
2014-2 573958.45 184.0 0.0 0.0 0.0 0.0
2015-02 59471.16 28.0 0.0 0.0 0.0 0.0
2015-01 69630.09 31.0 0.0 0.0 0.0 0.0
2015-03 64033.22 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 DRILL CUTTINGS 520.16 Tons RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 DRILLING FLUID WASTE 56.86 Bbl RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 FRACING FLUID WASTE 45.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FRACING FLUID WASTE 0.27 Bbl LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2014-1 FRACING FLUID WASTE 42.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 38.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2132721 2013-01-22 No Violations Noted At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2139208 2013-02-13 No Violations Noted No Violations noted
2152936 2013-04-02 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2163800 2013-05-02 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2174950 2013-06-13 In Compliance with Policy Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2175884 2013-06-13 No Violations Noted Conductor being cemented in at time of inspection. Inspection conducted w/OGI J. Branan.


2177611 2013-05-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182013 2013-07-05 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182377 2013-07-09 No Violations Noted Waiting on rig to commence tophole drilling.
2185968 2013-07-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that they were actively drilling the well and also indicated they were at approximately 1900' in depth. During the inspection the Department observed two areas of concern in relation the well pad and access road. The first location is the outlet of the perimeter ditch on the East side of the well pad. The Department observed sedimentation in the outlet rip rap on both sides of the road. The second area is located within the LOD between the well pad and area reserved for the CI. The Department suggest the operator add clean durable rock to the make shift basin and outlet up to the access road, and also clean the reinstall the silt sox to prevent sedimentation from leaving the LOD. The Department also notes that hay bales are not ABACT approved in HQ watersheds. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2188818 2013-08-01 No Violations Noted The issues outlined on the 7/24/2013 inspection # 2185968 have been addressed. During the inspection he Department observed both areas of concern and the temporary stabilization techniques the Operator employed to address the concerns of the Departments. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2189897 2013-08-06 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2195024 2013-08-07 No Violations Noted Waiting on rig to commence lateral drilling.
2209074 2013-10-02 No Violations Noted At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216389 2013-10-25 No Violations Noted At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2217797 2013-10-23 No Violations Noted Waiting on rig to commence lateral drilling.
2222915 2013-11-14 No Violations Noted Waiting on rig to commence lateral drilling.
2226515 2013-11-26 No Violations Noted Waiting on frac.
2243098 2014-02-06 No Violations Noted At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249715 2014-02-18 No Violations Noted At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249719 2014-03-03 No Violations Noted See inspection # 2249702 for events and description from the 3/3/2014 inspection.
2253172 2014-03-13 No Violations Noted See inspection # 2253170 for events and description from the 3/13/2014 inspection.
2360464 2015-04-13 No Violations Noted Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities
2361182 2015-04-08 No Violations Noted Well operating and properly identified. Well equipped with production unit (separation

For data sources see[3]

Chemical Data

HF Fluid Concentration Ingredient Additive Concentration Trade Name Purpose CAS number Supplier
89.8547 Water 100.0 Water Base Fluid & Mix Water 7732-18-5 Customer & CWS
25987.0 2-Propenoic acid 0.0 Sand (Proppant) DWP-111 polymer with 2-prop DAP-903
0.01288 Polyethylene glycol mixture 70.0 Sand (Proppant) DWP-111 25322-68-3 DAP-903
0.00044 Guar gum 60.0 Sand (Proppant) DWP-111 9000-30-0 DAP-903
0.00419 Goethite 0.1 Sand (Proppant) DWP-111 1310-14-1 DAP-903
0.0028 Poly(oxyethylene)nonylphenol ether 5.0 Sand (Proppant) DWP-111 9016-45-9 DAP-903
0.0 Oxirane 0.0 Sand (Proppant) DWP-111 2-methyl- DAP-903
6e-05 Sodium chloride 0.1 Sand (Proppant) DWP-111 7647-14-5 DAP-903
0.00061 Propargyl Alcohol 0.1 Sand (Proppant) DWP-111 107-19-7 DAP-903
68953.0 Quaternary ammonium compounds 0.0 Sand (Proppant) DWP-111 bis(hydrogenated ta DAP-903
0.10871 Acetic acid 100.0 Sand (Proppant) DWP-111 64-19-7 DAP-903
0.00124 Diallyldimethylammonium chloride 5.0 Sand (Proppant) DWP-111 7398-69-8 DAP-903
60.0 2-Propenoic acid 71050.0 Sand (Proppant) DWP-111 polymer with sodium DAP-903
2e-05 Ammonium Persulfate 100.0 Sand (Proppant) DWP-111 7727-54-0 DAP-903
20.0 2 10222.0 Sand (Proppant) DWP-111 2-Dibromo-3-Nitrilop DAP-903
0.00182 Modified thiourea polymer 0.1 Sand (Proppant) DWP-111 68527-49-1 DAP-903
0.0028 Sorbitan monooleate 5.0 Sand (Proppant) DWP-111 1338-43-8 DAP-903
68951.0 Alcohols 0.0 Sand (Proppant) DWP-111 C14-15 DAP-903
0.00191 Ilmenite 0.1 Sand (Proppant) DWP-111 98072-94-7 DAP-903
0.00517 Illite 1.0 Sand (Proppant) DWP-111 12173-60-3 DAP-903
0.00012 Formaldehyde 0.1 Sand (Proppant) DWP-111 50-00-0 DAP-903
68607.0 Dimethylcocoamine 0.0 Sand (Proppant) DWP-111 bis(chloroethyl) et DAP-903
0.00267 Apatite 0.1 Sand (Proppant) DWP-111 64476-38-6 DAP-903
60.0 Distillates (petroleum) 64742.0 Sand (Proppant) DWP-111 hydrotreated middle DAP-903
0.00989 Isopropanol 40.0 Sand (Proppant) DWP-111 67-63-0 DAP-903
0.00735 Methanol 15.0 Sand (Proppant) DWP-111 67-56-1 DAP-903
0.42431 Hydrochloric acid 35.0 Sand (Proppant) DWP-111 7647-01-0 DAP-903
0.1 Alkenes 64743.0 Sand (Proppant) DWP-111 C>10 a- DAP-903
0.1 Fatty acids 61790.0 Sand (Proppant) DWP-111 tall-oil DAP-903

For data sources see[4]