X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250210002

Well Details

Well ID: 0284250210002
Loading map...
Location: 00/10-02-028-25W4/2
Location Alias: 00/10-02-28-25 W4M
Location Alias 2: 00/10-02-028-25 W4/02
Province: Alberta
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 10-2-28-25
Operator Name: Ember Resources Inc.
License Number: 0305638
License Date: 2004-03-10
License Status: Issued
Spud Date: 2004-06-26
Final Drill Date: 2004-07-31
Well Total Depth: 937 m
Surface Hole Latitude: 51.368339
Surface Hole Longitude: -113.413021

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-09-08 Perforation 887 891 13
2004-10-10 Perforation 515.5 517.5 14
2004-10-29 Fracture 515.5 517.5 0
2004-11-08 Packing Device Capped w/Cement 873.5 881.5 0
2004-12-17 Perforation 593.1 593.6 13
2004-12-17 Perforation 591.3 591.8 13
2004-12-17 Perforation 559.4 559.9 13
2004-12-17 Perforation 557.4 557.9 13
2004-12-17 Perforation 551.4 551.9 13
2004-12-17 Perforation 543.5 544 13
2004-12-17 Perforation 542.4 542.9 13
2004-12-17 Perforation 534.2 534.7 13
2004-12-17 Perforation 533.7 534.2 13
2004-12-17 Perforation 527.1 527.6 13
2004-12-17 Perforation 489.8 490.3 13
2004-12-17 Perforation 479.8 480.3 13
2004-12-17 Perforation 478.7 479.2 13
2004-12-17 Perforation 465.5 466 13
2004-12-17 Perforation 462.4 462.9 13
2004-12-17 Perforation 443.5 444 13
2004-12-17 Perforation 435.8 436.3 13
2004-12-17 Perforation 427.3 427.8 13
2004-12-17 Perforation 417.5 418 13
2004-12-17 Perforation 413.8 414.3 13
2004-12-17 Perforation 362.5 363 13
2004-12-17 Perforation 311.4 311.9 13
2004-12-17 Perforation 302.5 303 13
2004-12-17 Perforation 300 300.5 13
2004-12-17 Perforation 190.7 191.2 13
2004-12-17 Perforation 183.6 184.1 13
2004-12-17 Perforation 182.9 183.4 13
2004-12-17 Perforation 180.2 180.7 13
2005-01-19 Fracture 180.2 593.6 0
2011-09-16 Perforation 210.5 211.5 13
2011-09-16 Perforation 235 236 13
2011-09-16 Perforation 238 240 13
2011-09-16 Perforation 287 288 13
2011-09-16 Perforation 291 293 13
2011-09-16 Perforation 377 379 13
2011-09-16 Perforation 383 386 13
2011-09-16 Perforation 519.5 521.5 13
2011-09-16 Perforation 566 568 13
2011-09-16 Perforation 638 639 13
2011-09-16 Perforation 665 667 13
2011-09-23 Fracture 210.5 667 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 72 9.3 0.0 0.0
2005 7808 498.1 0.0 0.0
2006 8685 293.0 0.0 0.2
2007 8708 231.2 0.0 0.1
2008 8783 176.7 0.0 1.2
2009 8759 187.4 0.0 0.0
2010 8746 188.9 0.0 0.3
2011 8440 255.8 0.0 1.7
2012 8778 305.4 0.0 0.9
2013 8715 175.4 0.0 1.4
2014 8671 158.0 0.0 0.0
2015 8699 151.2 0.0 1.8
2016 8783 147.7 0.0 2.1
2017 8759 112.4 0.0 1.2
2018 8745 113.7 0.0 0.0
2019 2076 29.4 0.0 0.0

For data sources see[4]

References