X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094220403002

Well Details

Well ID: 0094220403002
Loading map...
Location: 00/03-04-009-22W4/2
Location Alias: 00/03-04-09-22 W4M
Location Alias 2: 00/03-04-009-22 W4/02
Province: Alberta
County/Municipality: Lethbridge County
Well Name: TAC PENNY 3-4-9-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0221103
License Date: 1999-01-29
License Status: Issued
Spud Date: 1999-02-16
Final Drill Date: 1999-02-24
Well Total Depth: 1455 m
Surface Hole Latitude: 49.701689
Surface Hole Longitude: -112.930649

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-09 Perforation 1436.5 1438.5 13
1999-03-12 Acid Treatment 1436.5 1438.5 0
1999-03-15 Packing Device Capped w/Cement 1420 1428 0
1999-03-16 Perforation 1167.5 1171 13

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4033 6453.8 0.0 0.0
2000 8671 4834.0 0.0 0.0
2001 8685 2425.8 0.0 7.2
2002 8746 1993.1 0.0 16.8
2003 8664 1747.9 0.0 10.6
2004 8278 1281.3 0.0 14.8
2005 8034 1031.6 0.0 9.5
2006 7637 1416.0 0.0 8.7
2007 8522 1642.6 0.0 14.3
2008 8658 828.4 0.0 15.0
2009 8707 847.9 0.0 8.3
2010 8721 871.9 0.0 8.2
2011 8022 664.7 0.0 6.7
2012 8756 654.9 0.0 7.5
2013 8415 569.9 0.0 6.3
2014 8759 426.1 0.0 0.0
2015 8759 291.2 0.0 0.0
2016 8735 309.1 0.0 0.0
2017 8351 241.1 0.0 0.0
2018 8735 246.9 0.0 0.0
2019 2159 52.2 0.0 0.0

For data sources see[4]

References