If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012616B20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.474877,"lon":-110.041416,"icon":""}]} |
Location: B2/16-26-040-01W4/0 | |
Location Alias: B2/16-26-40-01 W4M | |
Location Alias 2: B2/16-26-040-01 W4/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: FCPI ETAL 16B2 HZL HAYTER 16-26-40-1 | |
Operator Name: | |
License Number: 0191550 | |
License Date: 1996-09-19 | |
License Status: Abandoned | |
Spud Date: 1996-09-24 | |
Final Drill Date: 1996-09-27 | |
Well Total Depth: 1189 m | |
Surface Hole Latitude: 52.474877 | |
Surface Hole Longitude: -110.041416 |
Start Date | Depth (m) | Reason |
---|---|---|
1996-09-25 | 615 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-09-28 | Slotted Liner | 873.8 | 1189 | 0 |
1996-10-18 | Perforation | 156 | 157 | 14 |
1996-10-19 | Remedial Casing Cementing | 156 | 157 | 0 |
1996-10-22 | Perforation | 129 | 130 | 14 |
1996-10-22 | Remedial Casing Cementing | 129 | 130 | 0 |
2005-11-07 | Cement Plug | 520 | 822 | 0 |
2005-11-08 | Cement Plug | 10 | 110 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 1003 | 0.0 | 0.0 | 66.8 |
1997 | 7974 | 23.4 | 0.0 | 8888.3 |
1998 | 8101 | 27.4 | 0.0 | 50447.0 |
1999 | 8315 | 18.8 | 0.0 | 69028.7 |
2000 | 7994 | 14.4 | 0.0 | 68807.5 |
2001 | 7399 | 15.3 | 0.0 | 66193.6 |
2002 | 8077 | 16.5 | 0.0 | 72356.0 |
2003 | 7253 | 13.7 | 0.0 | 65901.8 |
2004 | 7822 | 18.3 | 0.0 | 79040.3 |
2005 | 4319 | 13.4 | 0.0 | 46368.9 |
For data sources see[5]