X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675092404000

Well Details

Well ID: 0675092404000
Loading map...
Location: 00/04-24-067-09W5/0
Location Alias: 00/04-24-67-09 W5M
Location Alias 2: 00/04-24-067-09 W5/00
Province: Alberta
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 4-25 HZ SWANH 4-24-67-9
Operator Name: Aspenleaf Energy Limited
License Number: 0435499
License Date: 2011-07-27
License Status: Issued
Spud Date: 2011-08-28
Final Drill Date: 2011-09-14
Well Total Depth: 4010 m
Surface Hole Latitude: 54.822813
Surface Hole Longitude: -115.244874

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2011-09-05 2300 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-16 Open Hole/Barefoot Completion 4006 4010 0
2011-10-11 Multi-Stage Fracture 2717.9 2719 0
2011-10-11 Multi-Stage Fracture 2769.9 2770.7 0
2011-10-11 Multi-Stage Fracture 2833.8 2834.9 0
2011-10-11 Multi-Stage Fracture 2885.8 2886.6 0
2011-10-11 Multi-Stage Fracture 2938.9 2940 0
2011-10-11 Multi-Stage Fracture 3001 3001.8 0
2011-10-11 Multi-Stage Fracture 3053.7 3054.9 0
2011-10-11 Multi-Stage Fracture 3106 3106.8 0
2011-10-11 Multi-Stage Fracture 3158.9 3160.1 0
2011-10-11 Multi-Stage Fracture 3222.7 3223.5 0
2011-10-11 Multi-Stage Fracture 3275.7 3276.8 0
2011-10-11 Multi-Stage Fracture 3327.4 3328.2 0
2011-10-11 Multi-Stage Fracture 3389.9 3390.7 0
2011-10-11 Multi-Stage Fracture 3440.5 3441.3 0
2011-10-11 Multi-Stage Fracture 3500.6 3501.4 0
2011-10-11 Multi-Stage Fracture 3550.9 3551.7 0
2011-10-11 Multi-Stage Fracture 3612.5 3613.3 0
2011-10-11 Multi-Stage Fracture 3663.2 3664 0
2011-10-11 Multi-Stage Fracture 3725 3725.8 0
2011-10-11 Multi-Stage Fracture 3775.6 3776.4 0
2011-10-11 Multi-Stage Fracture 3837.7 3838.5 0
2011-10-11 Multi-Stage Fracture 3888.6 3889.4 0
2011-10-11 Multi-Stage Fracture 3939 3939.8 0
2011-10-11 Multi-Stage Fracture 3985.3 3986.6 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1616 8.0 0.0 0.0
2012 8421 535.3 0.0 0.0
2013 8592 236.4 0.0 0.0
2014 8729 199.8 0.0 0.0
2015 8710 167.4 0.0 0.0
2016 6935 115.8 0.0 0.0
2017 7022 98.3 0.0 0.0
2018 6871 157.3 0.0 0.0

For data sources see[5]

References