If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505090115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.291564,"lon":-115.199267,"icon":""}]} |
Location: 00/15-01-050-09W5/0 | |
Location Alias: 00/15-01-50-09 W5M | |
Location Alias 2: 00/15-01-050-09 W5/00 | |
Province: Alberta | |
County/Municipality: Brazeau County | |
Well Name: YANGARRA 02 HZ PEMBINA 15-1-50-9 | |
Operator Name: | |
License Number: 0436028 | |
License Date: 2011-08-16 | |
License Status: Suspension | |
Spud Date: 2011-09-07 | |
Final Drill Date: 2011-09-22 | |
Well Total Depth: 3060 m | |
Surface Hole Latitude: 53.291564 | |
Surface Hole Longitude: -115.199267 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-12 | 1674 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-03 | Open Hole/Barefoot Completion | 3041 | 3060 | 0 |
2011-10-03 | Multi-Stage Fracture | 2991.9 | 2992.8 | 0 |
2011-10-03 | Multi-Stage Fracture | 2882.5 | 2883.6 | 0 |
2011-10-03 | Multi-Stage Fracture | 2761.2 | 2762.3 | 0 |
2011-10-05 | Multi-Stage Fracture | 2641.3 | 2642.3 | 0 |
2011-10-05 | Multi-Stage Fracture | 2520.7 | 2521.8 | 0 |
2011-10-05 | Multi-Stage Fracture | 2401.1 | 2402.1 | 0 |
2011-10-06 | Multi-Stage Fracture | 2280.1 | 2281.2 | 0 |
2018-12-13 | Packing Device Capped w/Cement | 1961 | 1991 | 0 |
2018-12-13 | Packing Device Capped w/Cement | 1806 | 1816 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 813 | 99.7 | 0.0 | 806.7 |
2012 | 1 | 0.0 | 0.0 | 43.6 |
For data sources see[5]