X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685080407020

Well Details

Well ID: 0685080407020
Loading map...
Location: 02/07-04-068-08W5/0
Location Alias: 02/07-04-68-08 W5M
Location Alias 2: 02/07-04-068-08 W5/00
Province: Alberta
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 10-5 HZ SWANH 7-4-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0443143
License Date: 2012-01-20
License Status: Amended
Spud Date: 2012-05-02
Final Drill Date: 2012-05-17
Well Total Depth: 3932 m
Surface Hole Latitude: 54.859169
Surface Hole Longitude: -115.181658

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2012-05-07 2167 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-17 Open Hole/Barefoot Completion 3926 3932 0
2012-10-29 Multi-Stage Fracture 3907.3 3907.7 0
2012-10-29 Multi-Stage Fracture 3855.6 3856 0
2012-10-29 Multi-Stage Fracture 3783.7 3784.2 0
2012-10-29 Multi-Stage Fracture 3712.1 3712.6 0
2012-10-29 Multi-Stage Fracture 3641.7 3642.2 0
2012-10-29 Multi-Stage Fracture 3569.9 3570.3 0
2012-10-29 Multi-Stage Fracture 3498 3498.4 0
2012-10-29 Multi-Stage Fracture 3426 3426.5 0
2012-10-29 Multi-Stage Fracture 3354.3 3354.7 0
2012-10-29 Multi-Stage Fracture 3282.4 3282.8 0
2012-10-29 Multi-Stage Fracture 3210.8 3211.3 0
2012-10-29 Multi-Stage Fracture 3139 3139.4 0
2012-10-29 Multi-Stage Fracture 3067.4 3067.9 0
2012-10-29 Multi-Stage Fracture 2996.4 2996.8 0
2012-10-29 Multi-Stage Fracture 2921.8 2922.3 0
2012-10-29 Multi-Stage Fracture 2847.2 2847.7 0
2012-10-29 Multi-Stage Fracture 2786.7 2787.2 0
2012-10-29 Multi-Stage Fracture 2712.2 2712.6 0
2012-10-29 Multi-Stage Fracture 2637.6 2638 0
2012-10-29 Multi-Stage Fracture 2563 2563.5 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1194 86.0 0.0 0.0
2013 7553 419.5 0.0 0.0
2014 6825 363.1 0.0 0.0
2015 8190 372.3 0.0 952.3
2016 5613 256.2 0.0 1471.3
2017 8187 192.9 0.0 1349.6
2018 7809 206.4 0.0 1139.1
2019 1699 34.6 0.0 400.1

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-19 No Incident N/A N/A
2012-06-13 No Incident N/A N/A
2012-11-06 No Incident N/A N/A

For data sources see[6]

References